CONTROL ASSY,ELECTR
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP WEAPON SYSTEMS SUPPORT MECH, has issued a Solicitation for the procurement of CONTROL ASSY,ELECTR. This opportunity requires a bilateral award and includes an option for increased quantities. Responses are due by April 3, 2026.
Scope of Work
This solicitation outlines requirements for the manufacture and quality of the CONTROL ASSY,ELECTR. Key specifications include:
- Design: Must conform to specified Cage Code/Reference Number items (e.g., Cage 38450, ref. no. 2683-0000).
- Marking: Items must be physically identified in accordance with MIL-STD-130, REV N.
- Design Changes: Strict procedures for changes in design, material, servicing, or part number, requiring NAVICP-MECH Contracting Officer approval.
- Quality Assurance: Contractor is responsible for all inspection requirements, maintaining records for 365 days post-delivery. Government source inspection is required.
- Packaging: Preservation, packaging, packing, and marking must comply with MIL-STD 2073 and the Contract/Purchase Order Schedule.
Contract & Timeline
- Type: Solicitation, leading to a bilateral award.
- Set-Aside: None specified.
- Response Due: April 3, 2026, at 8:30 PM Z.
- Published: March 4, 2026.
- Delivery: All freight is FOB Origin.
- Option Quantity: The Government intends to add an option quantity, and offerors must provide pricing for this.
Submission Requirements
Offerors must provide:
- Unit Price and Extended Total Price (FIRM).
- Quotation validity (minimum 45 / desired 60 days).
- Procurement Turnaround Time (PTAT).
- Awardee CAGE, Government Source Inspection CAGE, and Final Acceptance/Packaging CAGE.
- Traceability: If not the manufacturer, a letter/official email from the OEM confirming authorized distributor status is required.
- Pricing for the option quantity.
Additional Notes
Document references, including military specifications and standards, must be obtained by the Contractor. Information on obtaining these documents, including those with specific distribution statements (e.g., "Official Use Only," "NOFORN"), is provided. Consideration for award will only be given to authorized distributors of the original manufacturer's item.