CONTROL DISPLAY, CD
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support Mech, is soliciting quotes for the repair of CONTROL DISPLAY, CD (CAGE 52088, Ref. No. N149001-1). This is a Solicitation for a bilateral award, requiring contractor acceptance. Quotes are due by February 27, 2026, at 8:30 PM EST.
Scope of Work
This opportunity covers the repair and associated quality requirements for the CONTROL DISPLAY, CD. All repair work must adhere to the contractor's standard practices, manuals, and directives, including drawings, technical orders, and approved repair standards. The Government is seeking a Repair Turnaround Time (RTAT) of 80 days. Government Source Inspection (GSI) is required.
Contract & Timeline
- Opportunity Type: Solicitation (RFQ for Repair)
- Award Type: Bilateral, requiring contractor acceptance
- Response Due: February 27, 2026, 8:30 PM EST
- Published Date: January 28, 2026
- Set-Aside: None specified
- FOB: Origin
- Freight: Handled by the Navy per Commercial Asset Visibility (CAV) Statement of Work
Key Requirements
- Authorized Distributors: Only authorized distributors of the original manufacturer's item will be considered. Proof of authorization on company letterhead is required with the offer.
- Item Identification: CONTROL DISPLAY, CD, CAGE 52088, Ref. No. N149001-1.
- Marking: In accordance with MIL-STD-130, REV N, 16 NOV 2012.
- Quality Assurance: Contractor is responsible for all inspection requirements and maintaining records for 365 days post-delivery. Inspection and testing of repaired items must follow original manufacturer's specifications.
- Packaging: MIL-STD 2073 applies.
- Changes: Design, material, servicing, or part number changes require NAVICP-MECH Contracting Officer approval, except for identical part number changes (Code 1).
Submission & Evaluation
Quotes must include Unit Price, Total Price, and the proposed Repair Turnaround Time (RTAT). If the proposed RTAT exceeds 80 days, capacity constraints must be provided. A price reduction will be incurred for failure to meet the required RTAT, with the amount to be specified by the contractor in their quote. Quotes should also address Teardown & Evaluation fees for items determined Beyond Repair (BR/BER) and provide new unit price/lead-time for comparison.
Additional Notes
Any questions should be directed to the Point of Contact: ADOLPHE.J.ANDOU.CIV@US.NAVY.MIL.