Control Tower Chamber Equipment Painting, Colebrook River Lake, Colebrook, CT

SOL #: W912WJ26QA081Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SD ENDIST NEW ENGLAND
CONCORD, MA, 01742-2751, United States

Place of Performance

Place of performance not available

NAICS

Painting and Wall Covering Contractors (238320)

PSC

Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 27, 2026
2
Last Updated
Apr 24, 2026
3
Submission Deadline
Apr 27, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, New England District, is soliciting quotes for Control Tower Chamber Equipment Painting at Colebrook River Lake, Colebrook, CT. This Total Small Business Set-Aside opportunity involves preparation and painting of various mechanical equipment within the gate chamber. The estimated magnitude of construction is between $100,000 and $250,000. Quotes are due by April 27, 2026, at 5:00 PM Eastern.

Scope of Work

The project requires preparation and painting of steel components in the gate chamber, including bonnets, hydraulic piping, cylinders, sump pump plumbing (excluding pumps), conduit pressure balancing pipe, vertical float well pipe, air shafts, and the entire spiral staircase. Preparation involves solvent cleaning and mechanical removal of loose paint/rust; dry abrasive blasting or water blasting of sound paint is prohibited. Painting requires an epoxy primer/sealer on corroded areas, followed by an overcoat matching existing paint color. The work assumes lead-containing paint and is considered a permit-required confined space. The contractor must adhere to strict worker health, safety, and environmental protection measures. The dam tower crane is unavailable, but the 5-ton winch hoist in the control tower is available.

Contract Details

This is a Firm Fixed Price Request for Quotation (RFQ). Work must commence within 30 calendar days and be completed within 120 calendar days after the Notice to Proceed. Insurance requirements include Workmen's Compensation, Employers' Liability, General Liability, and Automobile Liability.

Submission & Evaluation

Quotes are due by April 27, 2026, at 5:00 PM Eastern, and must be submitted via email to the Contract Specialist. A mandatory "Solicitation Survey" form must be completed and submitted with the quote, detailing company information, experience, personnel, and past performance. Evaluation will consider technical capability, price, and past performance. Vendors must have an active SAM.gov registration at the time of submission to be considered; non-registered vendors will be rejected. Site visits are highly recommended.

Key Documents & Amendments

Amendment 0001 was issued to post the site visit attendee list, confirming the closing date remains April 27, 2026. The Solicitation Survey (Form/Attachment) is a critical component for bidder evaluation. The Statement of Work (SOW) provides detailed requirements for the painting project, including specific submittals like Accident Prevention Plan, Site Safety and Health Plan, and Confined Space Plan.

Contact Information

For inquiries, contact Jennifer Samela at jennifer.m.samela@usace.army.mil or 978-318-8324.

People

Points of Contact

Files

Files

Download
Download
Download

Versions

Version 4
Solicitation
Posted: Apr 24, 2026
View
Version 3Viewing
Solicitation
Posted: Apr 20, 2026
Version 2
Solicitation
Posted: Apr 13, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 27, 2026
View