COUPLING,FLEXIBLE
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, through NAVSUP Weapon Systems Support Mechanicsburg, has issued a Solicitation for Flexible Couplings, specifically an 8-inch Sound Isolation Coupling. This critical requirement is for SPECIAL EMPHASIS material (Level I) used in crucial shipboard systems, demanding stringent quality control and traceability. Proposals are due by June 29, 2026.
Scope of Work
This opportunity involves the manufacturing and delivery of 8-inch Sound Isolation Couplings in accordance with Murdock Drawing 299944, assembly 299944-300. Key requirements include:
- Material Certification: Specific alloys (e.g., MIL-C-15726, QQ-N-281) for various components.
- Extensive Testing: Non-Destructive Tests (Dye Penetrant, Liquid Penetrant, Radiography), Proof Pressure Tests, Quality Conformance Tests, and Ultrasonic Inspection.
- Quality Assurance: Adherence to ISO-9001 (or MIL-I-45208) quality systems, with calibration per ISO-10012 or ANSI-Z540.3/ISO-17025 (or MIL-STD-45662).
- Traceability: Mandatory traceability and certification for Level I/SUBSAFE materials, including chemical and mechanical analysis, unique traceability numbers, and specific marking requirements.
- Welding/Brazing: Procedures and personnel must be qualified under specified standards (e.g., S9074-AR-GIB-010A/278).
- Configuration Control: Contractor must maintain total equipment baseline configuration and submit waivers/deviations and Engineering Change Proposals (ECPs) for approval.
- Mercury Free: Materials must be mercury-free.
Contract & Timeline
- Type: Solicitation (DO rated order under DPAS)
- Set-Aside: None specified
- Response Due: June 29, 2026, 8:30 PM EDT
- Published: June 15, 2026
- Delivery: Final material delivery within 365 days of contract effective date. Certification Data CDRLs due 20 days prior to scheduled delivery.
Additional Notes
Government Quality Assurance (GQA) at source is required. Contractors must notify the Government representative (DCMA) promptly for inspection planning. Electronic Contractor Data Submission (ECDS) is available for data submissions and inquiries.