COVERED PARKING ARRAY AT FARMINGDALE AFRC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE), New York District, has issued a solicitation for the construction of a Covered Parking Array at the Armed Forces Reserve Center (AFRC) in Farmingdale, NY. This project involves building two canopy structures with photovoltaic (PV) solar panels, an integrated stormwater drainage system, a premanufactured battery storage building, and four dual-port EV charging stations. The estimated project value is between $1,000,000 and $5,000,000. Proposals are due by February 04, 2026, at 2:00 PM EST.
Scope of Work
The required work includes:
- Base CLIN 0001: Construction of four dual-port car charging stations, supporting infrastructure, underground utility connections to the main electric room, and a prefabricated utility building for equipment and batteries.
- Option Line Item 0002: Construction of an East Parking Canopy, photovoltaic array, and associated infrastructure.
- Installation of an integrated gutter and stormwater drainage system.
- Work must adhere to specified plans and specifications.
Contract & Timeline
- Contract Type: Firm Fixed Price.
- Period of Performance: 692 days from Notice to Proceed (NTP).
- Bid Validity: 120 calendar days.
- Estimated Value: $1,000,000 - $5,000,000 (updated by Amendment 0002).
- NAICS Code: 236220 (Commercial and Institutional Building Construction).
- Small Business Size Standard: $45,000,000.00.
- Set-Aside: None specified.
- Response Due: February 04, 2026, at 2:00 PM EST (extended by Amendment 0004).
- Published Date: January 27, 2026 (latest amendment).
Submission & Evaluation
Bids will be evaluated based on price and other factors. Minimum required documents for submission include a signed SF 1442, acknowledged amendments, a filled bid schedule, and a bid guarantee. Bidders must submit a price for every Contract Line Item Number (CLIN). Standard Forms (SF24, SF25, SF25A) for bonds have been revised and must be used.
Additional Notes
- A Geotechnical Report and FCPSA RTA Drawings are available for review.
- The original FCPSA RTA Spec is the default document; the version posted with Amendment 0001 is no longer valid.
- No further bidder inquiries will be accepted.
- Contact Adrian Stafford-Browne at adrian.j.stafford-browne@usace.army.mil for administrative questions.