CP20-4 Structural Coatings
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The MOX Fuel Fabrication Facility (MFFF) is seeking a subcontractor for CP20-4 Structural Coatings for its Mixed Oxide Fuel Fabrication Building (BMF) located at the Savannah River Site in Aiken, SC. This is a Presolicitation for a Firm Fixed Unit Price subcontract, estimated to be in excess of $9 million. The work involves applying decontaminable structural concrete coatings to floors, walls, and ceilings within the BMF. No set-aside was specified for this opportunity.
Scope of Work
The selected subcontractor will be responsible for surface preparation, environmental controls, coating applications, and curing of protective coatings. This includes applying floor, wall, and ceiling painting systems according to specifications, managing material storage, furnishing and installing compressed air/breathing air equipment, supplying all necessary equipment and consumables for coating, and providing scaffolding. Cleanup and waste disposal are also part of the scope. MOX Services will provide the protective coating paint and will conduct all QA/QC inspections and NDE.
Facility Details
The BMF building comprises three main areas: the Mixed Oxide Processing Area (BMP), the Aqueous Polishing Area (BAP), and the Shipping and Receiving Area (BSR). The work will cover approximately 530 rooms across these areas, with work areas released in stages, potentially requiring multiple mobilizations and demobilizations.
Quality Assurance Requirements
The MFFF design is licensed by the Nuclear Regulatory Commission (NRC), and 10 CFR 50 - Appendix B (Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants) will apply. The structural coating applications are Quality Level 2. While a qualified NQA-1 Quality Assurance Program is not strictly required, firms must demonstrate their ability and experience performing this type of installation in a QA/QC environment. Subcontractors will need to have procedures in place, provide personnel training, and adhere to MOX Services Project and Safety Procedures.
Contract & Timeline
- Type: Firm Fixed Unit Price Subcontract (Presolicitation)
- Estimated Value: >$9,000,000
- Set-Aside: None specified
- RFP Scheduled: End of 3rd Quarter FY 2008
- Proposals Due: 4th Quarter FY 2008
- Award: 1st Quarter FY 2009
- Installation Start: 3rd Quarter FY 2009
- Completion: 2nd Quarter FY 2012
- Published: April 21, 2008
Contact Information
For inquiries, contact James D Detwiler, Senior Subcontract Administrator, at jddetwiler@moxproject.com or 803-819-2719.