CPLS MANIFOLDS
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Maritime - Norfolk is seeking proposals for CPLS Manifolds for the Norfolk Naval Shipyard (NNSY) in Portsmouth, VA. This is a Total Small Business Set-Aside combined synopsis/solicitation for the procurement of fifteen (15) new Continuous Purge Layup System (CPLS) Condenser Manifolds. These manifolds are critical for preventing corrosion in major components of CVN class nuclear aircraft carriers. Proposals are due by June 16, 2026, at 4 PM EST.
Scope of Work
The requirement is for the construction and purchase of fifteen (15) CPLS Condenser Manifolds, specifically 2 Outlet Manifold Boxes with 200 SCFM Flowmeters and 3/4" Piping. These portable systems introduce dried air to major components during maintenance periods. Key technical specifications include:
- Fully enclosed in a durable carrying case with access windows for gauges.
- Specific inlet (male 3/4" JIC 37 degree flare) and outlet connections.
- Components rated for a minimum of 150 psi.
- Inclusion of isolation valves, regulating valves (Norgren R74G or equivalent), pressure gauges (Ashcroft 1006 or equivalent), relief valves (Kunkle Model 1 or equivalent), and analog flow meters (RCM Industries 0-200 SCFM or equivalent).
- Must be capable of continuous year-round unmanned operation in ambient conditions.
- Adherence to cleanliness standards (STR-4P37 and STR-4P38).
- No detrimental materials (e.g., lead, sulfur, cadmium, halogens); Teflon tape not permitted within fluid boundary. Welding is permitted, but brazing and soldering are prohibited.
Contract & Timeline
- Contract Type: Combined Synopsis/Solicitation (FAR Part 13, Simplified Acquisition Procedures).
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Deliverables: Fifteen (15) CPLS Manifolds, As-Built Drawings, technical instructions, schematics, parts lists, and warranty information.
- Required Delivery Date: No later than October 28, 2026, FOB Destination to NNSY.
- Warranty: Standard commercial warranty of one year from delivery/acceptance.
- Questions Due: June 12, 2026, 4 PM EST.
- Proposal Due: June 16, 2026, 4 PM EST.
- Published: June 9, 2026.
Submission & Evaluation
- Submission Method: Email quotes to Mai.Elinow@dla.mil.
- Required Documents: Detailed (unpriced) capabilities statement, lead time, specifications (if alternate material), complete list of supplies, manufacturer/country of origin, and a price breakdown for the 15 manifolds. Submittals for proposed manufacturers or equal items are mandatory for technical review.
- Evaluation Factors: Award will be based on Lowest Price Technically Acceptable (LPTA), considering technical acceptability and price reasonableness.
- Eligibility: Vendors must be registered in the System for Award Management (SAM). A Wide Area Workflow (WAWF) account is required for payment.
Additional Notes
All items must be new; refurbished or used items will not be accepted. Contractors are responsible for familiarity with applicable clauses and provisions in effect through FAC 2024-02 and DFARS Change Notice 01/22/2024.