CPP Hub Overhaul, Manufacture, Parts Purchase

SOL #: 70Z08019R21051B00Pre-Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
SFLC PROCUREMENT BRANCH 3(00040)
BALTIMORE, MD, 21226, United States

Place of Performance

Place of performance not available

NAICS

All Other Miscellaneous Fabricated Metal Product Manufacturing (332999)

PSC

Ship And Marine Equipment (20)

Set Aside

No set aside specified

Timeline

1
Posted
Oct 26, 2018
2
Last Updated
Nov 16, 2018
3
Response Deadline
Nov 19, 2018, 9:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Amendment A00001 to Solicitation Number 70Z08019R21051B00 is issued to answer questions submitted in relation to the solicitation and to extend the submission deadline to 19 November 2018 by 4:30PM EST.

All other solicitation requirements remain unchanged.




Solicitation Number 70Z08019R21051B00 is for the purchase of OEM manufactured Controllable Pitch Propeller (CPP) hubs, OEM stock parts for CPP hubs, and overhaul of CPP hubs to OEM standards.

Proposals are due no later than 4:30PM EST on 16 November 2018.  All questions MUST be submitted in writing to Christina Ayers at christina.l.ayers@ucsg.mil.




This Presoliciation Notice replaces canceled solicitation number 70Z08018R21051B00.

Anticipated Request for Proposal (RFP) issue date is October 26, 2018.  RFP number is
70Z08019R21051B00.

People

Points of Contact

Christina AyersContract SpecialistPRIMARY
Deidre FisherSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Pre-Solicitation
Posted: Nov 16, 2018
Version 1
Pre-Solicitation
Posted: Oct 26, 2018
View
CPP Hub Overhaul, Manufacture, Parts Purchase | GovScope