Z--CRIP MC Checks and Lateral 73 Construction

SOL #: 140A1626R0005Solicitation

Overview

Buyer

Interior
Bureau Of Indian Affairs
BUREAU OF INDIAN AFFAIRS
RESTON, VA, 20192, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Canals (Z2KB)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 22, 2026
2
Last Updated
Feb 26, 2026
3
Submission Deadline
Mar 11, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Bureau of Indian Affairs (Department of Interior) is soliciting proposals for the CRIP MC Checks and Lateral 73 Construction project. This Firm-Fixed-Price contract, estimated between $18,000,000 and $22,000,000, involves significant civil and electrical engineering work. It is a Full and Open Acquisition with proposals due March 11, 2026, at 12:00 P.M. Eastern Time. The Product/Service Code is C211 (ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING).

Scope of Work

The project encompasses the rehabilitation and replacement of multiple check structures within the Colorado River Irrigation Project (CRIP) Main Canal (MC185, MC270, MC420) and the replacement of Lateral 73-36 Check 1. Key tasks include:

  • MC185/MC270 Check Structure Rehabilitation (CLIN 1): Demolition, concrete repair, installation of radial and lateral gates, electrical control systems, fencing, and road resurfacing.
  • MC420 Check Replacement (CLINs 2, 3, 4): Design and furnishing of a radial gate, mobilization, dewatering, site grading, foundation work, canal realignment, new structure construction, electrical systems, and site restoration.
  • MC420 Electrical Transmission and Distribution Modifications (CLIN 4): Realigning a 69kV power line and extending electrical distribution.
  • Lateral 73-36 Check 1 Replacement (CLIN 5): Construction of temporary bypasses, a new long-crested weir, a precast headgate structure, earthwork, and demolition of existing structures. The work requires familiarity with hydraulic structures, earthwork, drilled shaft foundations, and overhead electrical transmission lines.

Contract Details

  • Type: Firm-Fixed-Price.
  • Duration: 750 calendar days after Notice to Proceed.
  • Set-Aside: None (Competitive, Full and Open Acquisition).
  • NAICS: 237990, Other Heavy and Civil Engineering Construction (Size Standard: $45,000,000).
  • Bonds: A Bid Guarantee (20% of bid price or $2,000,000, whichever is less), Performance Bond (SF-25), and Payment Bond (SF-25A) are required.
  • TERO Fees: A 3.5% Tribal Employment Rights Office (TERO) fee applies to each pricing schedule.
  • Wage Rates: Department of Labor Wage Rates AZ20260007 and AZ20260052 are applicable.

Performance Location & Schedule

The project sites are located within the Colorado River Indian Reservation in La Paz County, Arizona, specifically southwest of Parker and south of Poston. Construction activities must be carefully coordinated with annual irrigation dry-up periods (two weeks in January, with an additional week in February for Lateral 73). Long-lead items are anticipated for installation during 2027/2028 dry-ups, and electrical transmission pole installation is expected in winter 2026/2027.

Evaluation & Submission

Proposals will be evaluated using the Lowest Price Technically Acceptable (LPTA) method. Key evaluation factors include total price, technical approach, key project management/technical support, proposed contract duration and summary schedule, and relevant experience and past performance. The technical proposal page limit has been increased to 75 pages. Proposals must be submitted electronically in two volumes (Price and Technical). Questions were reopened until February 20, 2026.

Key Considerations

  • Geotechnical: Reports detail subsurface conditions, seismic risks (including liquefaction potential), and foundation recommendations. Groundwater monitoring data is available.
  • Hazardous Materials: Lead-Based Paint (LBP) was identified on metal framing at Lateral 73, requiring special handling if disturbed. No asbestos was detected in sampled areas.
  • Safety: A dedicated full-time onsite Safety Manager is not explicitly required; a qualified senior team member can manage safety responsibilities, provided all requirements are met.

Contact

For inquiries, contact William McLaughlin at William.McLaughlin@bia.gov or (850) 281-3444.

People

Points of Contact

McLaughlin, WilliamPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Solicitation
Posted: Feb 26, 2026
View
Version 5
Solicitation
Posted: Feb 25, 2026
View
Version 4
Solicitation
Posted: Feb 24, 2026
View
Version 3Viewing
Solicitation
Posted: Feb 13, 2026
Version 2
Solicitation
Posted: Feb 5, 2026
View
Version 1
Solicitation
Posted: Jan 22, 2026
View
Z--CRIP MC Checks and Lateral 73 Construction | GovScope