Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Contracting Command – New Jersey is conducting market research through a Sources Sought (RFI) to identify potential sources for Exterior Door Replacements at the PFC. Ralph E. Pomeroy USARC in Rainelle, WV (WV035). This RFI is for information and planning purposes only and does not constitute a commitment to a future solicitation. Responses are due May 4, 2026.
Scope of Work
The project involves the removal and replacement of a total of eight (8) single doors and three (3) double sets of exterior doors, including frames and hardware, at the Rainelle, WV facility. Key requirements include:
- Direct replacement of existing doors and frames in design and size.
- New doors must be 18-gauge steel with surface-mounted adjustable closers and panic devices.
- Hardware must be commercial grade, ADA compliant, and match existing control key systems.
- Field verification of all dimensions and quantities is mandatory before ordering materials.
- Compliance with Unified Facilities Guide Specifications (UFGS), UFC, Army Regulation 420-1, and EM 385-1-1.
- Work includes insulation, caulking, painting, signage replacement, and restoration of damaged surfaces.
Contract & Timeline
- Type: Sources Sought / Request for Information (RFI)
- Set-Aside: None specified
- Response Due: May 4, 2026, 2:00 PM ET
- Published: April 28, 2026
- Period of Performance: 120 Calendar Days from Notice to Proceed Date.
- Place of Performance: 259 John Raine Drive, Rainelle, WV 25962-1456.
Evaluation
Responses will be used for information and planning purposes only. Not responding to this RFI does not preclude participation in any future Request for Quote (RFQ), if one is issued.
Special Requirements
- A Pre-Construction Meeting (PCM) is required.
- Contractor personnel must complete AT Level I awareness, iWATCH, and OPSEC training.
- Strict adherence to safety (EM 385-1-1, OSHA) and environmental regulations is required.
- Submittals for materials are required 30 days prior to installation, with final documentation due 30 days prior to contract completion.
- Contractor is responsible for debris removal and disposal records.