CY26 LCS Work Plan MLWR 26-1018, Install Taxiway Guidance Signs in Kunsan AB

SOL #: W90VN726QA004Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
630TH SUPPORT DETACHMENT
APO, AP, 96202-5273, United States

Place of Performance

Place of performance not available

NAICS

Highway (237310)

PSC

Construction Of Other Airfield Structures (Y1BZ)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 28, 2026
2
Last Updated
May 13, 2026
3
Submission Deadline
May 29, 2026, 4:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, through its 630TH SUPPORT DETACHMENT, has issued a Combined Synopsis/Solicitation for the installation of Taxiway Guidance Signs at Kunsan Air Base. This effort, identified as CY26 LCS Work Plan MLWR 26-1018, falls under the product service code for Construction of Other Airfield Structures (Y1BZ).

Scope of Work

This opportunity involves the installation of taxiway guidance signs, contributing to airfield infrastructure improvements at Kunsan Air Base. Specific details regarding the scope of work, technical requirements, and performance standards are available through the official solicitation documents.

Contract & Timeline

  • Type: Combined Synopsis/Solicitation
  • Set-Aside: None specified
  • Response Due: May 29, 2026
  • Published: May 13, 2026

Additional Notes

Interested parties must log in to https://piee.eb.mil and search for the solicitation number 'W90VN726QA004' to obtain complete details and all associated documents. This is a critical step for all potential bidders to access the full solicitation package and prepare their responses.

People

Points of Contact

Files

Files

View
View
View

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 13, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
CY26 LCS Work Plan MLWR 26-1018, Install Taxiway Guidance Signs in Kunsan AB | GovScope