Daugherty Wetland Restoration Project Clark County, Illinois
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Department of Agriculture - Natural Resources Conservation Service (NRCS) is soliciting proposals for the Daugherty Wetland Restoration Project in Clark County, Illinois. This Total Small Business Set-Aside opportunity involves significant excavation, tile exploration, habitat mound construction, and seeding. Amendment 1 added Line Item 004 for Excavation - Tile Trench, and bidders must acknowledge all amendments. Proposals are due May 19, 2026, at 2:00 PM CT.
Scope of Work
The project requires the contractor to provide all supervision, labor, tools, equipment, transportation, and materials for:
- Mobilization and demobilization of forces and equipment.
- Excavation of pools, tile exploration, and creation of habitat mounds.
- Disposal of excavated materials.
- Furnishing and placing seed in designated areas.
- Adherence to industry standards, federal, state, and local construction, safety, and labor laws.
- Removal and proper disposal of all debris and excess materials.
- Specific bid items include "Excavation, Common" (20,943 cubic yards) and "Tile Exploration and Drain Removal Trench" (5,523 feet).
Contract Details
- Contract Type: Firm Fixed-Price
- Period of Performance: 37 calendar days after Notice to Proceed.
- Estimated Value: Between $100,000 and $250,000.
- Set-Aside: 100% Total Small Business (NAICS 237990, $45M size standard).
- Place of Performance: Martinsville, IL.
- Award: One award is anticipated.
Submission & Evaluation
- Proposal Submission Deadline: May 19, 2026, 2:00 PM CT.
- Submission Method: Emailed quotes on company letterhead, signed, and dated to Bobby Copenny II at bobby.copenny@usda.gov.
- Questions Deadline: May 12, 2026, 2:00 PM CT, submitted in writing to bobby.copenny@usda.gov.
- Evaluation Criteria: Award will be made to the responsible offeror whose quote represents the best value to the Government, considering only price. Quotes will be evaluated without discussions. Unbalanced or unrealistically low pricing may result in rejection.
- Eligibility: Active SAM registration is required.
Key Dates & Actions
- Site Visit: May 5, 2026, 10:00 AM CT at USDA/NRCS Service Center, 1001 N. York Street, Martinsville IL 62442. Attendance is highly recommended but not mandatory. Site Visit POC: Matt Dassenbrock (matt.dassenbrock@usda.gov, 217-208-4020).
- Questions Due: May 12, 2026, 2:00 PM CT.
- Proposals Due: May 19, 2026, 2:00 PM CT.
Important Notes
Bidders must acknowledge all amendments with their bid submission. The project is subject to Service Contract Labor Standards, with Wage Determination IL20250015Rev. O (effective 01/02/2026) applicable for prevailing wage rates. Contractors are responsible for any damages to county roads, water crossings, and culverts, and must obtain COTR approval for any proposed stream crossings.