Delta 8 10 SOPS Matrix Switch

SOL #: FA255026Q0016Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA2550 50 CONS PKP
SCHRIEVER SFB, CO, 80912-2116, United States

Place of Performance

Point Mugu NAWC, CA

NAICS

Other Electronic Component Manufacturing (334419)

PSC

Switches (5930)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 20, 2026
2
Submission Deadline
Apr 30, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, FA2550 50 CONS PKP, has issued a Combined Synopsis/Solicitation (RFQ) for the Delta 8 10 SOPS Matrix Switch. This opportunity seeks to procure two Universal Switching Corporation Digital Matrix Switches (Model S24530BX-664-D2) and one spare kit (SPK-S24530BFX-1). This acquisition is a Total Small Business Set-Aside and is restricted to the Universal Switching Corporation brand due to proprietary rights and compatibility with existing ground systems. Offers are due by April 30, 2026, at 1400 Mountain Daylight Time.

Scope of Work

This requirement is for the provision of:

  • Two (2) new Universal Switching Corporation Digital Matrix Switches, Model S24530BX-664-D2. These are 5RU rack mount units designed for interconnecting RS-232/530 digital DTE to DCE devices, featuring hot-swap redundant power supplies, CPU modules, enhanced touchscreen control, and dual AC power inputs.
  • One (1) new SPK-S24530BFX-1 Spares Kit, which includes specific modules such as a 3-channel interface module, switch-stage module, power supply module, remote control module, gender changer, touchscreen display, and chassis fan.

This equipment is essential for supporting Delta 8/10 SOPS operations and maintenance of FLTSATCOM, UFO, and MUOS satellite constellations. Delivery is required at the 10th Space Operations Squadron at Point Mugu, CA.

Contract Details

  • Type: Combined Synopsis/Solicitation (RFQ), Firm Fixed Price.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS: 334419, with a size standard of 750 employees.
  • Product Service Code: 5930 (Switches).
  • Place of Performance: Point Mugu NAWC, CA.
  • Delivery: 14 weeks from the date of award.
  • Brand Name Justification: The brand name restriction to Universal Switching Corporation is justified under 10 U.S.C. 3204(a)(1) due to the OEM's proprietary rights and the unique compatibility requirements with the existing ground system's software codes, hardware interface, form, fit, and function.

Submission & Evaluation

  • Questions Due: April 27, 2026, 1400 Mountain Daylight Time.
  • Offers Due: April 30, 2026, 1400 Mountain Daylight Time.
  • Submission Instructions: Offers must be submitted to kade.allen@spaceforce.mil and marion.shinholster@spaceforce.mil. Submissions must include the solicitation number, offeror details (name, address, phone, UEI, EFT indicator), information for evaluation factors, representations and certifications, a statement of agreement with terms, a redacted quote, and a completed Attachment 2 - CLIN Pricing Schedule.
  • Evaluation Factors (in relative order of importance):
    1. Price
    2. Technical Acceptability (meeting salient characteristics/specifications)
    3. Schedule (ability to meet delivery/performance period and installation)
    4. Warranty (conformance to requested warranty)
  • Non-price factors combined are approximately equal to price. The Government may award based on initial quotes without discussions and may accept other than the lowest priced quotation if it represents the best value.

Contacts

People

Points of Contact

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
Delta 8 10 SOPS Matrix Switch | GovScope