Demo B6142

SOL #: FA46612526Q0006Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4661 7 CONS CD
DYESS AFB, TX, 79607-1581, United States

Place of Performance

Dyess AFB, TX

NAICS

Site Preparation Contractors (238910)

PSC

Demolition Of Buildings (P400)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Nov 20, 2025
2
Last Updated
Dec 12, 2025
3
Submission Deadline
Dec 16, 2025, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

AMENDMENT #0001 - 11 Dec 2025

The Purpose of this Amendment is to: state a revision to the proposal due date for RFQ B6142, which is now extended to December 16, 2025, at 12:00 PM CST. Furthermore, the corresponding Q&A sheet is now attached & clearer Drawings are attached. Submissions must include a Bid Bond guarantee to be considered. Additionally, in the event of an award, 100% performance & payment bonds are required upon contract execution. The remaining terms & conditions of this RFQ are unaffected by this amendment.

END AMENDMENT.

Please Advise: The Site Visit for this requirement will fall immediately after the Site Visit for Demo B6119 (FA466126Q0005).

Bldg 6142 has an approximate total square footage of 15,275. This project will demolish in its entirety to include concrete slabs and foundations to a depth of three feet below existing grade elevation. This will also include, but not limited to the following: sidewalks, drives, utilities, select fill, tops of structural concrete piers & pier caps, steel reinforcing, wood framing, gypsum board, masonry, transite panels, doors, frames, windows, caulking, gypsum & lay-in ceilings/grid, floors, carpet, tile, plumbing lines & fixtures, accessories, furniture,
insulation, wood & metal framing, HVAC units, ducting & registers, piping, pumps, electrical panels, conduit, wiring, lighting, transformers, gas lines & meters, roofing, flashing, etc.
 
The Contractor shall furnish all demolition, layout, survey, plant, labor, supervision, quality control, materials, equipment, machines, shoring, tools, fencing and incidentals and performing all operations in connection with the demolition of Building 6142 in accordance with the attached project drawings and specifications.

People

Points of Contact

SrA John G. CraigSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Solicitation
Posted: Dec 12, 2025
View
Version 4Viewing
Solicitation
Posted: Dec 11, 2025
Version 3
Solicitation
Posted: Dec 11, 2025
View
Version 2
Solicitation
Posted: Dec 1, 2025
View
Version 1
Solicitation
Posted: Nov 20, 2025
View
Demo B6142 | GovScope