Demolition of Cavity Wall complete with labor and material

SOL #: 191N6526Q0026-A0001Special Notice

Overview

Buyer

State
State, Department Of
U.S. EMBASSY NEW DELHI
WASHINGTON, DC, 20520, United States

Place of Performance

NEW DELHI, IN-DL, India

NAICS

Construction (23)

PSC

Demolition Of Buildings (P400)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 7, 2026
2
Action Date
Apr 9, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of State, specifically the U.S. Embassy New Delhi, has issued an Amendment (A001) to solicitation 191N6526Q0026 for the Demolition of Cavity Wall complete with labor and material in New Delhi, India. This amendment provides crucial clarifications and updates based on discussions during a contractor's walk-through. The response date remains April 9, 2026, at 6:00 PM Z. This is a Special Notice related to demolition services.

Scope of Work

This amendment details the contractor's responsibilities for demolition, protection, site access, and equipment. Key aspects include:

  • Demolition Scope: Removal of walls, services (toilets only), and disposal of all demolition fixtures. Doors with frames must be removed and returned to the USG. Wardrobe removal and disposal are also required.
  • Protection Measures: Contractors must protect the entire second floor, newly laid ground floor, balcony railing, and new floors from debris and during material hauling. Dust protection is mandatory.
  • Site Access & Interruption: The ground floor will host events, requiring contractors to accommodate weekly interruptions of approximately four hours.
  • Utilities & Equipment: Contractors must provide their own portable toilet connected to the existing sanitary line and maintain cleanliness. Hydraulic jacks are necessary for the initial demolition phase.
  • Service Protection: Existing bathroom services (sanitary and wastewater drainage) and ducts running through walls must be protected.
  • Restrictions: Heavy hammering or vibration-producing activities are strictly prohibited.
  • Area Specifications: Specific dimensions are noted for low-height corridor ceilings (450 sq ft) and low-height bathroom ceilings (400 sq ft).

Contract & Timeline

  • Type: Special Notice (Amendment to Solicitation 191N6526Q0026)
  • Product/Service Code: P400 (Demolition Of Buildings)
  • Set-Aside: None specified
  • Response Due: April 9, 2026, 6:00 PM Z
  • Published Date: April 7, 2026
  • Amendment Effective Date: April 7, 2026

Additional Notes

This amendment does not extend the deadline for offers. Contractors are required to acknowledge receipt of this amendment with their submission. For inquiries, contact Chaitanya Sharma, Procurement Supervisor (sharmac@state.gov) or Sudhir P. Kamath (kamathsp@state.gov).

People

Points of Contact

Chaitanya Sharma, Procurement SupervisorPRIMARY
Sudhir P. KamathSECONDARY

Files

Files

Download

Versions

Version 1Viewing
Special Notice
Posted: Apr 7, 2026
Demolition of Cavity Wall complete with labor and material | GovScope