Demolition of Maintenance Hangar, Building 3542, Kadena Air Base, Okinawa, Japan
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, W2SN ENDIST JAPAN, has issued a Solicitation for the Demolition of Maintenance Hangar, Building 3542, at Kadena Air Base, Okinawa, Japan. This project involves the complete demolition and disposal of the existing facility, including hazardous material abatement and site restoration. Proposals are due April 28, 2026.
Scope of Work
The scope encompasses the demolition of Maintenance Hangar Building 3542 and associated structures. Key elements include:
- Detailed demolition procedures, sequencing, and disposal.
- Management and abatement of hazardous materials, including asbestos-containing material (ACM), lead-based paint (LBP), PCBs, and mercury.
- Utility disconnections and protection of existing facilities.
- Erosion control measures and site restoration.
- Waste management with a goal of diverting at least 60% of solid waste from landfills.
- Refurbishment work for the Chibana ballfield.
- Compliance with safety regulations (EM 385-1-1, NFPA) and environmental protection requirements.
Contract Details
- Type: Solicitation
- Product Service Code: Y1BZ (Construction Of Other Airfield Structures)
- Place of Performance: Kadena Air Base, Okinawa, Japan
- Set-Aside: None specified.
Key Requirements & Information
Bidders must review the provided demolition drawings and specifications thoroughly. These documents detail construction phasing, airfield access restrictions, FOD management, and specific requirements for hazardous material handling. "As-Built" drawings are provided for informational purposes only and do not amend the solicitation; bidders are responsible for verifying actual site conditions.
Timeline
- Published Date: February 19, 2026
- Response Due Date: April 28, 2026
Contact Information
- Primary: Norman Roldan (norman.roldan.civ@usace.army.mil, 81-98-970-9041)
- Secondary: Erica Stiner (erica.j.stiner.civ@usace.army.mil, 81-98-970-9066)