Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army is issuing a Presolicitation for a Design-Bid-Build (DBB) contract to repair Storm Sewer Water and Sanitary Sewer Systems at Caserma Miotto, Longare, Vicenza, Italy. This project aims to achieve environmental compliance and prevent future flood damage. The solicitation will be advertised as Unrestricted for full and open competition. The Request for Proposal (RFP) is anticipated to be issued on or about June 26, 2026.
Project Description
This DBB construction project focuses on repairing, upsizing, and decoupling cross-connected sewer systems at the Miotto Military Installation. The goal is to ensure proper independent discharge and full compliance with environmental regulations, addressing failed stormwater and sanitary sewer systems. Key elements include:
- Repairing, extending, and upsizing failed stormwater system piping.
- Remediating site conditions from recent storm events, including severe flooding, soil erosion, and landslide vulnerabilities.
- Separating cross-connected sanitary and storm lines.
- Constructing a new direct connection to the Bisatto River via an underground TOC pipe.
- Installing a mandated stormwater lamination tank beneath a municipal sports field, as required by local Italian regulations.
- Restoring the impacted municipal training field with a new synthetic turf surface.
- Integrating naturalistic design features (sedimentation tanks, retention ponds, weir walls) to reduce stormwater velocity. Options include asbestos pipe removals, reinstallation of the sports field, landslide area repairs, and sedimentation pond installation.
Contract & Timeline
- Type: Design-Bid-Build (DBB) Construction
- Competition: Unrestricted, Full and Open Competition
- NAICS Code: 237110, Water and Sewer Line and Related Structures Construction (Small Business Size Standard: $45,000,000)
- Magnitude: Between $10,000,000 and $25,000,000
- Completion Time: 1,010 calendar days after award
- Anticipated Award: September 2026
- Anticipated RFP Release: On or about June 26, 2026
- Published Date: June 10, 2026
Evaluation
This is a source selection procurement utilizing the best value continuum tradeoff process (FAR 15.103-1). Evaluation will consider both non-price factors (technical, experience, and past performance) and price proposals. Specific evaluation factors will be detailed in the solicitation.
Additional Notes
All prospective offerors must be registered and have an active registration in the System for Award Management (SAM) at https://www.sam.gov. The RFP (Solicitation Number: W912PF26RA011) will be downloadable from PIEE (https://piee.eb.mil) and SAM.gov. Contractors are encouraged to register for the solicitation to receive amendments. Questions can be directed to Stacey Miller at stacey.l.miller45.civ@army.mil.