Design-Build and Construction Services MATOC to support Industrial Base Modernization at Government Owned - Contractor Operated (GOCO) Facilities
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Army Contracting Command – Rock Island (ACC-RI), on behalf of Project Lead Joint Services (PL JS), intends to establish a Multiple Award Task Order Contract (MATOC) for Design, Build, and Commissioning services. This MATOC will support industrial base modernization efforts at various Government-Owned, Contractor-Operated (GOCO) Army Ammunition Plants (AAPs). This is a pre-solicitation notice; the formal Request for Proposal (RFP) is anticipated for release in April 2026.
Scope of Work
The MATOC will provide comprehensive design, build, and commissioning support for modernization projects. This includes a wide range of substantial projects utilizing design-build, design-bid-build, and progressive design-build methods. Services will cover:
- Design, construction, and commissioning of energetic material manufacturing lines (e.g., explosives, propellants).
- Load, assembly, and pack lines.
- Shell casing and metal parts production lines.
- Building upgrades, energy projects, and environmental projects.
- Full commissioning of new or upgraded facilities to prove production capability and readiness. Successful offerors will be responsible for providing all necessary personnel, equipment, supplies, supervision, architectural, engineering, design, construction, and commissioning work as defined in subsequent Task Orders.
Contract & Timeline
- Contract Vehicle: Multiple Award Task Order Contract (MATOC) Indefinite Delivery/Indefinite Quantity (IDIQ).
- Period of Performance: Five (5) year ordering period from the date of award.
- Competition Strategy: Full and Open Competition.
- Anticipated RFP Release: April 2026.
- Published Date: March 24, 2026.
- Place of Performance: Work will be performed at Holston AAP (TN), Iowa AAP (IA), Lake City AAP (MO), Milan AAP (TN), Scranton AAP (PA), Radford AAP (VA), and Quad City Cartridge Case Facility (IL).
Evaluation Approach
The Government intends to award a MATOC to all responsible offerors whose proposals meet or exceed the Minimum Technical Threshold Rating (MTTR). Source selection will follow Revolutionary FAR Overhaul 15.2, using a Highest Technically Rated Offeror (HTRO) self-scoring methodology. Price will not be an evaluation factor for the MATOC award but will be evaluated at the individual Task Order level.
Additional Notes
This is a pre-solicitation synopsis for informational purposes only and is not an RFP. The Government is not seeking proposals at this time. Interested parties are responsible for monitoring SAM.gov for the official solicitation and any related documents or amendments.