Design-Build (DB) IDIQ MACC for FL/GA/SC AO

SOL #: N69450-22-D-0002P00006Justification

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM SOUTHEAST
NAS JACKSONVILLE, FL, 32212-0030, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Other Administrative Facilities And Service Buildings (Y1AZ)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 18, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVFAC SYSCOM SOUTHEAST has issued a Justification and Approval (J&A) to increase the Not-To-Exceed (NTE) capacity of the existing Design-Build (DB) IDIQ Multiple Award Construction Contract (MACC) for the Florida, Georgia, and South Carolina Area of Operations (AO). This J&A seeks to raise the MACC's capacity by $93 million, from $411 million to $504 million, to accommodate urgent, unforeseen critical work required in Fiscal Year 2026.

Scope of Change

This J&A modifies the following MACC contracts (N69450-22-D-0003 through N69450-22-D-0009) by increasing their overall capacity. The MACC covers Design-Build and Design-Bid-Build projects for general construction, including new construction and renovation, across Florida, Georgia, and South Carolina. The period of performance for these contracts remains unchanged, ending on November 7, 2026.

Justification for Other Than Full and Open Competition

The statutory authority cited for this action is 10 U.S.C. 3204(a)(2) and FAR 6.302-2 (Unusual and compelling urgency). The original NTE capacity was deemed insufficient due to critical projects identified for FY26 that, if delayed, would result in serious injury to mission-critical operations at various Navy and Marine Corps installations. Utilizing the existing MACC for Design-Build projects is estimated to be 60% faster than standalone contracts, offering a more cost-effective and timely solution. Other NAVFAC SE MACCs are also nearing capacity exhaustion, and a new MACC is not anticipated to be awarded in time to meet these immediate needs.

Affected Projects

Specific projects requiring this increased capacity include, but are not limited to, TRF Interface Wharf, Firefighting Trainer Modernization, Secure Space Renovation, TRF MV Transformers, Renovation, Shoreline Stabilization, and Submarine Camel Repairs at various locations.

Future Competition

To address future requirements, a new $1.5 billion Medium AO MACC is anticipated in November 2026. Until then, new projects will be competed standalone as necessary.

Contract Details

  • Contract Type: Design-Build (DB) IDIQ Multiple Award Construction Contract (MACC)
  • Affected Contracts: N69450-22-D-0003 through N69450-22-D-0009
  • Capacity Increase: $93M (from $411M to $504M)
  • Period of Performance End: November 7, 2026
  • Set-Aside: None specified for this J&A (modifies existing contracts)
  • Published Date: March 18, 2026

Additional Notes

This document is a modification to existing contracts and does not represent a new solicitation for proposals. It ensures the continued execution of mission-critical construction projects through the existing MACC framework.

People

Points of Contact

Files

Files

Download

Versions

Version 1Viewing
Justification
Posted: Mar 18, 2026