Design-Build F-35A Integrated Training Center Academics Buildin

SOL #: W9127819R0014Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W074 ENDIST MOBILE
MOBILE, AL, 36602-3630, United States

Place of Performance

EGLIN AFB, FL

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construct Of Structures/Facilities (Y)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 15, 2019
2
Last Updated
Feb 20, 2019
3
Response Deadline
Feb 28, 2019, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

THIS PROJECT IS ADVERTISED ON AN UNRESTRICTED BASIS

UTILIZING FAR PART 15 SOURCE SELECTION PROCEDURES

THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE FOR THIS PROJECT IS 236220.

The cost of this work is estimated to be between $25,000,000.00 and $100,000,000.00.

Design and construction of a new one story 85,510 SF maintenance training facility at Eglin AFB. The new facility is located adjacent to the existing Academic Training Center (ATC). The facility contains academic classrooms, virtual trainers, various aircraft
mockups and administrative / operations areas. Additionally, there are the typical building support functions including mechanical, electrical, fire protection and communications equipment rooms. The Project also includes underground utilities, paving including
access roads, storm drainage, exterior and site lighting, site improvements, landscaping, underground comm infrastructure to connect the new facility, and AT/FP measures.

People

Points of Contact

MICHAEL J. SCISMCONTRACT SPECIALISTPRIMARY
Kyle M. RodgersContracting OfficerSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 9
Pre-Solicitation
Posted: Feb 20, 2019
View
Version 8
Pre-Solicitation
Posted: Feb 15, 2019
View
Version 7
Pre-Solicitation
Posted: Feb 11, 2019
View
Version 6
Pre-Solicitation
Posted: Feb 5, 2019
View
Version 5
Pre-Solicitation
Posted: Jan 29, 2019
View
Version 4
Pre-Solicitation
Posted: Jan 23, 2019
View
Version 3
Pre-Solicitation
Posted: Jan 16, 2019
View
Version 2
Pre-Solicitation
Posted: Jan 16, 2019
View
Version 1Viewing
Pre-Solicitation
Posted: Jan 15, 2019
Design-Build F-35A Integrated Training Center Academics Buildin | GovScope