Design-Build Maintenance and Repair Army Reserve (MRAR) Renovation of Army Reserve Center (ARC) Building 662 at BT Collins ARC, Sacramento, CA
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
*****AMENDMENT 0005 IS ISSUED TO PHASE II SELECTED OFFERORS ON THURSDAY, 28 AUGUST 2025*****
All Amendment 0002, 0003, 0004, and 0005 documents are available for download from the Procurement Integrated Enterprise Environment (PIEE) website. Go to the Attachments/Links section of the SAM notice and access the hyperlink titled PIEE Solicitation Module Link for W912QR25RA014. Once at the site, scroll down to the Attachments section of the PIEE Solicitation Module to locate the documents.
*****AMENDMENT 0002 WAS ISSUED TO PHASE II SELECTED OFFERORS ON MONDAY, 04 AUGUST 2025*****
*****AMENDMENT 0003 WAS ISSUED TO PHASE II SELECTED OFFERORS ON MONDAY, 22 AUGUST 2025*****
*****AMENDMENT 0004 WAS ISSUED TO PHASE II SELECTED OFFERORS ON TUESDAY, 26 AUGUST 2025*****