DESIGN-BUILD REPLACE DORM 19
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS
The items listed below are to be replaced by the corresponding added and/or revised
paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are
indicated by a note in bottom right hand corner of each paragraph or page. Added
sections are hereby made a part of the contract and are to be inserted in the
specification in the proper numerical/alphabetical sequence.
Within the specifications, deletions from the specifications are indicated by
strikethrough, e.g.: deletions are marked with strikethrough and additions to the
specifications including revisions/substitutions are indicated in bold, italic and
underlined, e.g.: additions are indicated thus.
Corresponding Added or Revised Paragraph
SECTION Page, and/or Section
VOLUME 1
00 11 00 Revised Paragraphs 4.2 and 4.3
Appendix A Replaced sheets as indicated herein.
VOLUME 2
Appendix F Replaced in its entirety.