Design New Lacquer Preparation Facility for RDX and HMX Production at Holston Army Ammunition Plant (HSAAP)

SOL #: W911S226RA003Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FT DRUM
FORT DRUM, NY, 13602-5220, United States

Place of Performance

Place of performance not available

NAICS

Engineering Services (541330)

PSC

Architect And Engineering Construction: Ammunition Facilities (C1EA)

Set Aside

No set aside specified

Timeline

1
Posted
Jul 30, 2025
2
Last Updated
Dec 3, 2025
3
Response Deadline
Aug 14, 2025, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The existing Lacquer Preparation Facility at Holston Army Ammunition Plant, Kingsport, TN, comprising ofBuildings 149/150 and a chemical/solvent storage tank farm, is the only facility capable of producing lacquer batches forthe production of all plastic bonded explosives (PBX). The facility receives, stores, handles, and processes the bindermaterials and solvents in manufacturing the lacquer in explosives production. Mobile wagons are used to transfer lacquerfrom the facility to the explosives production buildings. Lacquer is a mixture of dissolved rubbery polymer materials in asolvent that is used as a binding agent in reducing the sensitivity of RDX, HMX, and TATB based explosives formulations.A plasticizer instead of lacquer may also be prepared in the facility to be used as a feedstock raw material in formulatingRDX based explosives. The Lacquer Facility supports legacy explosives and the new Insensitive Munitions (IM) explosivesbeing developed at HSAAP.This effort will require Architect-Engineering (A-E) design services for a new Lacquer PreparationFacility with all the necessary process equipment to support annual production capacity expansion with a minimum of 15Mlbs of RDX and 2.5M lbs of HMX based formulations. This will ensure continuity of operations in maintaining the productioncapability, quality, safety, and environmental requirements to meet modern standards and permits. This new facility willsupport the expansion modernization of HSAAP RDX, HMX, and IMX production capacity to provide a viable capability tomeet current/future DoD explosives production.

People

Points of Contact

Files

Files

No files attached to this opportunity

Versions

Version 3
Combined Synopsis/Solicitation
Posted: Dec 3, 2025
View
Version 2
Combined Synopsis/Solicitation
Posted: Sep 19, 2025
View
Version 1Viewing
Sources Sought
Posted: Jul 30, 2025
Design New Lacquer Preparation Facility for RDX and HMX Production at Holston Army Ammunition Plant (HSAAP) | GovScope