Y--DEVA 335272 Repair Flood Damaged Titus Canyon Road

SOL #: 140P2026R0013Solicitation

Overview

Buyer

Interior
National Park Service
DSC CONTRACTING SERVICES DIVISION
Denver, CO, 80225, United States

Place of Performance

Place of performance not available

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 10, 2025
2
Last Updated
Feb 4, 2026
3
Submission Deadline
Feb 10, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), through its DSC Contracting Services Division, is soliciting proposals for the repair of flood-damaged Titus Canyon Road in Death Valley National Park, Inyo County, California. This project involves extensive road repair and environmental protection measures. This acquisition is a Total Small Business Set-Aside. Proposals are due by Tuesday, February 10, 2026, at 9:00 AM Mountain Time.

Scope of Work

This project entails repairing approximately 14 miles of a one-lane, unpaved road (Titus Canyon Road) severely damaged by extreme rain and flooding. Key tasks include:

  • Repairing erosion gullies and armoring wash crossings with riprap.
  • Removing berms and resurfacing the roadway, utilizing existing on-site material where possible.
  • Installing drain humps (water bars) and drainage channels.
  • Obtaining precast concrete barriers for drainage humps.
  • Performing repairs at the Fall Canyon Trailhead, including regrading, riprap placement, and replacing a steel vehicle gate. The estimated magnitude of construction is between $5,000,000.00 and $10,000,000.00.

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP).
  • Period of Performance: Work must commence within 10 calendar days of the Notice to Proceed and be completed within 365 calendar days.
  • Liquidated Damages: $1,270.00 per calendar day for delays.
  • NAICS Code: 237310 (Road, Highway, and Street Construction) with a small business size standard of $45 Million.

Submission & Evaluation

Proposals will be evaluated based on Technical Ability/Approach, Past Performance, and Price. The Government may select a proposal other than the lowest price if the benefits merit the price differential. Offerors must submit proposals and questions via email. Key submission documents include:

  • Experience Form (B08_Attachment_8): To demonstrate relevant past contracts.
  • Past Performance Questionnaire (B08_Attachment_7): To be completed by references.
  • General References (B08_Attachment_4): For surety, banks, insurance, subcontractors, and suppliers.
  • Subcontract Percentage Worksheet (B08_Attachment_5): To ensure compliance with small business subcontracting limitations.
  • Contract Price Schedule (B08_Attachment_1): For pricing submission.
  • Wage Determination (B08_Attachment_6): To ensure compliance with prevailing wage rates.
  • Waste Management Plan Worksheet (B08_Attachment_2): For environmental compliance. Offerors must acknowledge all solicitation amendments. Volume I (Technical Ability and Past Performance) has no specified page limit, font size, or project limitation.

Key Clarifications & Amendments

Several amendments have been issued, providing crucial clarifications and extending deadlines:

  • Amendment 0006 (Latest): Extended the proposal due date to February 10, 2026, 9:00 AM MT. Addressed numerous vendor questions regarding material mixing, compaction, environmental protection, monitoring, timelines, noise restrictions, traffic control, and more.
  • Amendment 0005: Clarified that the NPS will provide biologists and monitors for environmental surveys (nesting bird, desert tortoise, archeological, paleontological). Blasting is not allowed, and night/weekend/federal holiday work requires prior written consent. Camps are not permitted within the park. Up to two simultaneous active work sites per resource monitoring area (max six total) are allowed.
  • Amendment 0001: Changed the pre-proposal site visit dates to January 20-21, 2026.

Important Dates

  • Last Day for Questions: Wednesday, January 28, 2026, 9:00 AM Mountain Time.
  • Proposal Due Date: Tuesday, February 10, 2026, 9:00 AM Mountain Time.

Contact Information

For inquiries, contact Rachel Dyer at rachel_dyer@nps.gov.

People

Points of Contact

Dyer, RachelPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7Viewing
Solicitation
Posted: Feb 4, 2026
Version 6
Solicitation
Posted: Jan 25, 2026
View
Version 5
Solicitation
Posted: Jan 17, 2026
View
Version 4
Solicitation
Posted: Jan 14, 2026
View
Version 3
Solicitation
Posted: Jan 13, 2026
View
Version 2
Solicitation
Posted: Jan 9, 2026
View
Version 1
Solicitation
Posted: Dec 10, 2025
View