DOCKSIDE: USCGC CROCODILE DS FY26

SOL #: 70Z08026QPBPL0006Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
SFLC PROCUREMENT BRANCH 1(00080)
NORFOLK, VA, 23510, United States

Place of Performance

Saint Petersburg, FL

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (East) Ship Repair (Including Overhauls And Conversions) Performed On Non Nuclear Propelled And Nonpropelled Ships East Of The 108th Meridian (J998)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Nov 5, 2025
2
Last Updated
Dec 8, 2025
3
Submission Deadline
Dec 3, 2025, 4:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

This will be a ship repair contract for USCGC CROCODILE FY26 Dockside maintenance availabiltiy designed to complete all standard recurring maintenance items: watertight closures, main diesel engine assemlies, electrical power distribution system, thermographic inspection, ventilation system, engine room supply and exhaust fan assemblies, grey water holding tanks, and cleaning/inspecting sewage holding tanks. The execution of this contract and following work will take place at the cutter's homepier unless otherwise specified within the solicitation and provided statement of work. The estimated period of performance start date is 17MAR2026 and end date is 14APR2026.

People

Points of Contact

Jaime R. SmithSECONDARY

Files

Files

Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Dec 8, 2025
View
Version 3
Combined Synopsis/Solicitation
Posted: Nov 7, 2025
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Nov 5, 2025
Version 1
Combined Synopsis/Solicitation
Posted: Nov 5, 2025
View