Dome Maintenance Minot AFB
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
This requirement is for Preventative Maintenance and repair services for the Minot AFB Air‑Supported Dome also known as the "The Dome". The Contractor must provide all personnel, equipment, tools, materials, transportation, and supervision, in support of Inspection and Preventative Maintenance and Repair Service for Minot AFB's Air-Supported Dome unless specifically identified with the attached performance work statement.
-- Amendment 1: Extended RFP by 15 days from 5 Jan 2026 to 20 Jan 2026, updated Attachment 3 Quote Sheet, updated Wage Determination from Revision 2 to Revision 3 and included Q&A in attachments --