DOOR,WTID
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP WEAPON SYSTEMS SUPPORT MECH, has issued a Solicitation for the procurement of DOOR,WTID. This opportunity requires bidders to provide manufacturing and quality assurance for the specified item. Proposals are due by March 24, 2026.
Scope of Work
This solicitation covers the manufacture and contract quality requirements for the DOOR,WTID. Key requirements include:
- Item Identification: Furnishing items based on specified Cage Code/Reference Number (e.g., 70876 8100-1251-0191 LINE ITEM 113).
- Marking: Physical identification in accordance with MIL-STD-130, REV N.
- Design Changes: Specific procedures and codes (1-6) for changes in design, material, or part number, requiring PCO approval.
- Quality Assurance: Contractor is responsible for all inspection requirements and maintaining records for 365 days post-delivery. Government source inspection is required.
- Packaging: MIL-STD 2073 applies.
Contract & Timeline
- Type: Solicitation (resultant award will be bilateral, requiring contractor's written acceptance).
- Set-Aside: None specified.
- Response Due: March 24, 2026, 8:30 PM EST
- Published: March 4, 2026
- Freight: FOB Origin.
Important Considerations
- Traceability: Non-manufacturers must provide a letter/official email from the OEM confirming authorized distributorship with their offer.
- Verification: Offerors must verify nomenclature, part number, and NSN prior to responding.
- Quotation Validity: Minimum 45 days, desired 60 days.
Additional Notes
Detailed instructions are provided for obtaining applicable documents and specifications, including those from DODSSP, DLA, and specific Navy commands. Information on distribution statements for documents (A, B, C, D, E, F, X) is also included.