Douthit Gunnery Complex Fiber Optic Repair

SOL #: W911RX26QA038Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FT RILEY
FORT RILEY, KS, 66442-0248, United States

Place of Performance

Fort Riley, KS

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Electric Wire, And Power And Distribution Equipment (N061)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 17, 2026
2
Last Updated
Apr 28, 2026
3
Submission Deadline
May 1, 2026, 5:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army is soliciting proposals for Fiber Optic Repair at the Douthit Gunnery Complex, Fort Riley, Kansas. This Total Small Business Set-Aside opportunity requires the replacement of in-ground fiber optic cables to restore connectivity. Proposals are due by May 1, 2026.

Scope of Work

The contractor will replace existing underground fiber optic cabling at two locations on the Douthit Gunnery Range. This involves:

  • Decommissioning and removing old fiber optic cable.
  • Trenching to a depth of 4-6 feet.
  • Installing new contractor-furnished '3-pair Fiber' optic cable (approximately 80 meters at the first location and 70 meters at the second).
  • Backfilling excavated areas.
  • Performing all required terminations and comprehensive testing.
  • Repairing a junction block and replacing a 'fan-out kit' at the second location.
  • The contractor is responsible for flagging the locations of both fiber optics and utilities.

Contract Details

  • Contract Type: Firm-Fixed-Price, non-severable.
  • Period of Performance: May 11, 2026, to September 30, 2026. The actual work is expected to be completed within 14 calendar days from contract award, scheduled to avoid interference with Gunnery Complex training.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Place of Performance: Douthit Gunnery Complex, Fort Riley, KS.

Evaluation Factors

Award will be made on a Trade-off Best-Value basis, considering Price, Technical Capability, Scheduling Ability, and Past Performance. Non-price factors (Technical, Scheduling, Past Performance) combined are considered equally important to price.

  • Technical Capability: Evaluated on an Acceptable/Unacceptable (Pass/Fail) basis, including Management Approach, Staffing Approach, Quality Control, and Staffing. A Quality Control Plan (QCP) is required within 10 days of award.
  • Scheduling Ability: Evaluated based on the offeror's effective work scheduling method.
  • Past Performance: Assessed for recency (within 3 years), relevancy, and quality.
  • Price: Evaluated for reasonableness, completeness, and balance.

Submission Requirements & Deadlines

  • Proposal Due Date: May 1, 2026, 05:00 AM ET.
  • Price Hold: Offerors must hold prices firm until June 1, 2026.
  • Submission Method: Electronic quotes via email to Noah Younger (noah.w.younger.civ@army.mil).
  • Required Documents: Offerors must completely fill out, sign, and submit 'Solicitation - W911RX26QA038' and 'Douthit Fiber Optic Repair - Salient Characteristics'.
  • Key Information: In the 'Further Contractor Comments' section of the Salient Characteristics document, detail the ability to perform work immediately upon the May 11, 2026 start date and the required range downtime.
  • Site Visit: A site visit was held on April 27, 2026, but attendance was not mandatory for proposal submission.
  • Contact: Noah Younger (noah.w.younger.civ@army.mil, 5207148003).

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
View