Amendment 1 - Dover AFB - Corrosion Control Services

SOL #: FA449726Q0022Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4497 436 CONS LGC
DOVER AFB, DE, 19902-5016, United States

Place of Performance

Dover AFB, DE

NAICS

Other Support Activities for Air Transportation (488190)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Aircraft And Airframe Structural Components (J015)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 27, 2026
2
Last Updated
May 27, 2026
3
Submission Deadline
Jun 15, 2026, 11:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, specifically FA4497 436 CONS LGC, is soliciting proposals for Aircraft Corrosion Control Services at Dover Air Force Base, DE. This Total Small Business Set-Aside opportunity seeks a contractor to provide comprehensive maintenance for C-17 and C-5 aircraft. The contract will be a Firm-Fixed-Price (FFP) award under Simplified Acquisition Procedures. Quotes are due June 15, 2026, at 7 AM EDT.

Scope of Work

The contractor will provide all personnel, equipment, tools, materials, and supervision for aircraft wash, corrosion control, and miscellaneous maintenance services for C-5 and C-17 aircraft. Key services include:

  • Aircraft towing, preparation, washing, and lubrication.
  • Interior cleaning (major, minor, flight station, troop/cargo compartment, underfloor).
  • Landing gear wash & lube, large area cleaning, special area wash.
  • Isochronal/HSC inspection wash and de-panel, anti-skid removal/replacement.
  • Emergency services, environmental compliance, and facility maintenance. All services must adhere to the Performance Work Statement (PWS) and strict environmental and safety regulations.

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP)
  • Period of Performance: October 1, 2026 – September 30, 2031 (Base year + 4 option years).
  • Place of Performance: Dover AFB, DE 19902.
  • Set-Aside: Total Small Business (NAICS 488190, Size Standard $40M).
  • Product Service Code: J015 (Maintenance, Repair And Rebuilding Of Equipment: Aircraft And Airframe Structural Components).
  • Wage Determination: Wage Determination 2015-4217 Revision 33 applies.

Submission & Evaluation

Offerors must submit quotes in three volumes with a total page limit of 30 pages.

  • Volume I (Price): Utilize Attachment 2 - Quote Schedule. Wage Determination 2015-4217 Rev 33 applies.
  • Volume II (Technical): Include a Technical Approach (detailing plans for personnel, equipment, surge, and a site manager with >10 years experience), a Quality Control Plan, a Contractor Personnel Training Plan, and a Mission Essential Plan.
  • Volume III (Past Performance): Provide recent (within 5 years) and relevant (6+ months duration, similar scope/complexity) past performance. Evaluation will follow a Lowest Price Technically Acceptable (LPTA) approach, considering Price, Technical Acceptability (four subfactors), and Past Performance. SAM registration is required. The government intends to award without discussions.

Key Dates & Contacts

  • Questions Due: June 8, 2026, 12 PM EDT.
  • Quote Response Deadline: June 15, 2026, 7 AM EDT.
  • Quote Acceptance Period: Firm until October 7, 2026.
  • Primary Contact: TSgt James Meeks (james.meeks.1@us.af.mil, 3026772109).
  • Secondary Contact: Anna George (anna.george.2@us.af.mil, 3026774969).

People

Points of Contact

TSgt James MeeksPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3
Combined Synopsis/Solicitation
Posted: May 27, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 27, 2026
Version 1
Combined Synopsis/Solicitation
Posted: May 27, 2026
View