DPW - Air Emission Source Testing

SOL #: FA527026Q0015Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA5270 18 CONS PK
APO, AP, 96368-5199, United States

Place of Performance

Okinawa, JP-47, Japan

NAICS

Hazardous Waste Treatment and Disposal (562211)

PSC

Air Quality Analysis (B502)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 23, 2026
2
Last Updated
May 18, 2026
3
Submission Deadline
May 22, 2026, 1:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Air Force – 18th Contracting Squadron, Kadena AB Japan, on behalf of U.S. Army Installations in Okinawa, Japan, is soliciting proposals for Air Emission Source Testing services. This unrestricted (full and open competition) opportunity seeks a contractor to perform semi-annual testing and analysis of air emissions from boilers and diesel engines. The contract will be a Single Award, Requirements type, Firm Fixed Price agreement with a period of performance from June 1, 2026, to May 31, 2031. Proposals are due May 22, 2026, at 10:00 AM Japan Standard Time (JST).

Scope of Work

The contractor will provide all management, tools, supplies, equipment, and labor for air emission monitoring. Amendment 0001, posted May 18, 2026, clarified the testing scope. Key tasks include:

  • Semi-annual testing of three (3) boilers at Torii Station and three (3) diesel engines/fuel pumps at Chimuwan Tank Farm 1 & 2, and Kuwae Tank Farm 2.
  • Laboratory analysis of exhaust gas samples for parameters such as Particulate Matter (PM), Nitrogen Oxides (NOx), and Sulfur Oxides (SOx). "PM" refers to particulate matter (soot/dust) under applicable Japanese Air Pollution Control standards.
  • Compliance with the Japanese Air Pollution Control Act, local Okinawa environmental regulations, and the 2024 Japan Environmental Governing Standards (JEGS).
  • Preparation and submission of a Work Plan (WP), Site Safety and Health Plan (SSHP), and comprehensive Draft and Final Reports.
  • Required personnel include a Contract Project Manager (CPM) and bilingual safety personnel. The contractor/laboratory must possess Japanese analytical laboratory licenses and adhere to JIS analytical test procedures.

Contract Details

  • Type: Single Award, Requirements type, Firm Fixed Price.
  • Duration: Base year (June 1, 2026 – May 31, 2027) plus four (4) option years, extending through May 31, 2031.
  • Set-Aside: Unrestricted (Full and Open Competition).
  • NAICS Code: 562211.
  • Product Service Code (PSC): B502 (Air Quality Analysis).
  • Place of Performance: U.S. Army Garrison Okinawa, Japan, including Torii Station, Chimuwan Tank Farm 1 & 2, and Kuwae Tank Farm 2.

Submission & Evaluation

  • Proposal Due Date: May 22, 2026, 10:00 AM JST.
  • Submission Method: Electronically via email. Files must be in Microsoft WORD, EXCEL, or Adobe .pdf format, not exceeding 3 MB (zip files not accepted).
  • Requirements: Offerors must complete SAM.gov fill-ins and certifications, and submit copies of required Japanese certifications and licenses.
  • Evaluation: Award will be based on price and other factors, with price being a key consideration.

Key Dates & Contacts

  • Site Visit: A site visit was scheduled for May 14, 2026, at 10:00 AM JST at Kuwae Tank Farm 2. The reservation deadline for this visit was May 12, 2026.
  • Primary Contact: Sayaka Music (sayaka.music.jp@us.af.mil, 3156345838).
  • Secondary Contact: Ken Kuresaki (ken.kuresaki.jp@us.af.mil, 3156340022).

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 18, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View