DRAFT Anniston Army Depot FORGE 2 Other Transaction Authority (OTA) Request for Proposal (RPP)

SOL #: W91QEY-26-R-A002Special Notice

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC TSC
FORT SAM HOUSTON, TX, 78234-0000, United States

Place of Performance

Anniston, AL

NAICS

No NAICS code specified

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
Apr 24, 2026
2
Last Updated
May 26, 2026
3
Action Date
May 8, 2026, 4:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, through the Mission & Installation Contracting Command (MICC) Theater Support Center (TSC), has released a Draft Request for Prototype Proposal (RPP) for the Anniston Army Depot (ANAD) FORGE 2.0 initiative. This opportunity, under Other Transaction Authority (OTA) (10 U.S.C. § 2808a), seeks to modernize ANAD facilities by designing and constructing four key buildings: a Component Remanufacture Facility, a Missile Maintenance Facility, a Paint Facility, and a Storage Facility. The anticipated total funding is approximately $600-$665 Million. The Anticipated Prototype Proposal Due Date is June 10, 2026, at 5:00 PM EDT.

Scope of Work

The project involves the design and construction of four distinct facilities at Anniston Army Depot, AL, to enhance military fabrication and depot capabilities. Key deliverables include:

  • Component Remanufacturing Facility (CRF): Approximately 175,000 SF, including demolition of up to three existing buildings, for depot-level remanufacturing of vehicle parts.
  • Guided Missile Maintenance Facility (GMMF): Approximately 46,000-50,000 SF, including renovation of Building 705 and construction of a new facility for THAAD Missile recertification.
  • Vehicle Paint Facility: Construction of a new paint shop, including demolition of existing buildings 243, 441, and 449.
  • Storage Facility: Construction of two industrial, insulated, pre-engineered metal buildings (PEMB), each approximately 32,000 SF, for combat vehicle storage. All designs must adhere to Unified Facilities Criteria (UFC) and incorporate AT/FP, cybersecurity, and sustainability requirements.

Contract & Timeline

  • Type: Other Transaction Authority (OTA) for a Prototype Project, with a contemplated Firm-Fixed-Price (FFP) production follow-on agreement.
  • Estimated Value: $600-$665 Million.
  • Period of Performance: Not to exceed 60 months.
  • Anticipated RPP Issue Date: May 22, 2026.
  • Anticipated Prototype Proposal Due Date: June 10, 2026, at 5:00 PM EDT.

Eligibility & Evaluation

  • Set-Aside: None specified. This opportunity is open to businesses of all sizes and socioeconomic categories.
  • Evaluation Criteria: Proposals will be evaluated based on Technical Approach and Design, Construction Capabilities, and Cost Savings Potential / Overall Costs, in descending order of importance. The government will select the best overall offer.

Key Information & Actions

An Industry Day and Government Technical Information Exchange was held on May 13-14, 2026, at Anniston Army Depot. One-on-one meetings with potential prime vendors were also conducted. Interested parties should review the Draft RPP and associated attachments, including the Statement of Objectives and specific project details. Questions should be submitted via the provided Excel attachment to usarmy.jbsa.acc-micc.mbx.tsc-div1@army.mil.

Primary Point of Contact: Jennifer Hastedt, Agreement Officer, MICC TSC, usarmy.jbsa.acc-micc.mbx.tsc-div1@army.mil.

People

Points of Contact

MICC TSC Division 1 PLEASE EMAIL HERE FIRSTPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Special Notice
Posted: May 26, 2026
View
Version 4Viewing
Special Notice
Posted: May 19, 2026
Version 3
Special Notice
Posted: May 6, 2026
View
Version 2
Special Notice
Posted: May 4, 2026
View
Version 1
Special Notice
Posted: Apr 24, 2026
View