Draft RFP - Near Earth Orbit Network Program's Sounder for Microwave-Based Applications

SOL #: DRFP-NEON-SMBA-2025Sources Sought

Overview

Buyer

National Aeronautics And Space Administration
National Aeronautics And Space Administration
NASA GODDARD SPACE FLIGHT CENTER
GREENBELT, MD, 20771, United States

Place of Performance

Place of performance not available

NAICS

Search (334511)

PSC

Space Vehicle Components (1675)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 18, 2025
2
Last Updated
Mar 13, 2026
3
Response Deadline
Oct 6, 2025, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

NASA Goddard Space Flight Center (GSFC) has issued a Draft Request for Proposal (RFP) for the Near Earth Orbit Network (NEON) Program's Sounder for Microwave-Based Applications (SMBA). This notice is for information and planning purposes only; no proposals are being accepted at this time. It outlines the refined acquisition strategy for an upcoming Final RFP, which will seek a contractor to design, develop, and support SMBA instruments.

Purpose & Scope

The principal purpose of this requirement is to design, develop, and support the SMBA instruments, which are passive microwave sounders intended to produce global atmospheric temperature and moisture profiles for NOAA and the science community. The effort falls under the NEON program. This Draft RFP allows industry to verify the reasonableness and feasibility of the requirement and promotes competition for the future solicitation.

Acquisition Strategy & Contract Details

The acquisition is planned as a single award contract with no down-select phase. The contract will feature a multi-CLIN structure:

  • CLIN 0001: Cost Plus Fixed Fee (CPFF) with a Schedule Incentive for Flight Model (FM) 1, covering Non-Recurring Engineering, the Engineering Development Program, FM1 Production through launch + 6 months, and parts for FM1-3.
  • CLIN 0002: Firm Fixed Price (FFP) for FM2 and FM3 Production through Bench Acceptance Test.
  • CLIN 0003: Time and Materials (T&M) for Task Orders, including special studies, post-commissioning support for FM1, and post-bench acceptance test support for remaining FMs. Offerors will be required to price the entire effort through FM8. The funding profile for the Offeror's Cost/Price Volume is capped at 10% for GFY27, 20% for GFY28, and 20% for GFY29 (of total proposed cost/price). The NAICS code is 334511 (Space Vehicle Components) with a small business size standard of 1,350 employees. This will be a Full and Open Competition.

Key Requirements & Deliverables

The contractor will be responsible for the development, fabrication, integration, testing, analysis, verification, delivery, and post-launch support of SMBA instruments. Key documents defining requirements include the Performance Requirements Document (PRD) Revision E, the Statement of Work (SOW) Revision C, and the Contract Data Requirements List (CDRL) Revision C. Specific deliverables include:

  • Financial Management Reporting (NASA 533 series).
  • Organizational Conflicts of Interest (OCI) Plan, Cyber Supply Chain Risk Management (C-SCRM) Plan, Safety and Health Plan, and Small Business Subcontracting Plan.
  • Compliance with international travel requirements for personnel, including counterintelligence briefings and clearances. Government Furnished Property (GFP) will include Standard Black Body Calibration Targets.

Evaluation Factors

Mission Suitability will be evaluated based on Technical Approach, Management Approach (400 points), and Small Business Utilization (100 points). The past performance threshold for size relevancy has been lowered. Proposed enhancements should be detailed using Performance Work Statement (PWS) terminology in Attachment L.

Anticipated Timeline & Submission

The Final Request for Proposal (RFP) is anticipated for release in Q1 Calendar Year 2026. Proposals will be due approximately 45-60 calendar days after the RFP release. The contract award is targeted for Q2 Calendar Year 2027. The deadline for feedback on the Draft RFP (October 6, 2025) has passed. Potential offerors are responsible for monitoring Sam.gov for the release of the Final RFP and any amendments. NASA intends to publicize a listing of respondents to facilitate teaming arrangements.

Contact Information

For questions, contact Bruce Tsai at Bruce.B.Tsai@nasa.gov.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 29
Sources Sought
Posted: Mar 13, 2026
View
Version 28
Sources Sought
Posted: Mar 12, 2026
View
Version 27
Sources Sought
Posted: Mar 9, 2026
View
Version 26
Sources Sought
Posted: Mar 6, 2026
View
Version 25
Sources Sought
Posted: Feb 4, 2026
View
Version 24
Sources Sought
Posted: Jan 23, 2026
View
Version 23
Sources Sought
Posted: Jan 20, 2026
View
Version 22
Sources Sought
Posted: Jan 15, 2026
View
Version 21
Sources Sought
Posted: Jan 7, 2026
View
Version 20
Sources Sought
Posted: Dec 18, 2025
View
Version 19Viewing
Sources Sought
Posted: Oct 21, 2025
Version 18
Sources Sought
Posted: Sep 12, 2025
View
Version 17
Sources Sought
Posted: Sep 5, 2025
View
Version 16
Sources Sought
Posted: Sep 5, 2025
View
Version 15
Sources Sought
Posted: Jun 18, 2025
View
Version 14
Sources Sought
Posted: Jun 13, 2025
View
Version 13
Sources Sought
Posted: May 28, 2025
View
Version 12
Sources Sought
Posted: May 27, 2025
View
Version 11
Sources Sought
Posted: May 21, 2025
View
Version 10
Sources Sought
Posted: May 15, 2025
View
Version 9
Sources Sought
Posted: May 14, 2025
View
Version 8
Sources Sought
Posted: May 5, 2025
View
Version 7
Sources Sought
Posted: May 5, 2025
View
Version 6
Sources Sought
Posted: Apr 30, 2025
View
Version 5
Sources Sought
Posted: Apr 25, 2025
View
Version 4
Sources Sought
Posted: Apr 22, 2025
View
Version 3
Sources Sought
Posted: Apr 21, 2025
View
Version 2
Sources Sought
Posted: Apr 21, 2025
View
Version 1
Sources Sought
Posted: Apr 18, 2025
View