DRAFT Statement of Work- Fort Belvoir Roofing SATOC IDIQ
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
Update as of 15 JUL 2025: The solicitation has been posted as: Fort Belvoir SATOC Roofing IDIQ-W5168W-25-R-A005.
__________________________________________________________
Update as of 10 JUL 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
___________________________________________________________
Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
___________________________________________________________
Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
____________________________________________________________
Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
____________________________________________________________
Update as of 31 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please be advised that two URLs in the Statement of Work have been updated to the following: https://stg.wbdg.org/dod/ufgs (Unified Facilities Guide Specifications (UFGS)) and https://www.nibs.org/wbdg/ffc-dod (Unified Facilities Criteria (UFC)). Please continue to monitor Sam.gov for updates.
___________________________________________________________
Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
________________________________________________________________
Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.
________________________________________________________________
Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
_________________________________________________________________
Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
__________________________________________________________________
As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.
The official solicitation is forthcoming.