DRY DOCK USCG BEAR FY26 UPDD

SOL #: 70Z08026QMECP0008Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
SFLC PROCUREMENT BRANCH 1(00080)
NORFOLK, VA, 23510, United States

Place of Performance

Portsmouth, VA

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (East) Ship Repair (Including Overhauls And Conversions) Performed On Non Nuclear Propelled And Nonpropelled Ships East Of The 108th Meridian (J998)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 29, 2026
2
Last Updated
Mar 9, 2026
3
Submission Deadline
Apr 10, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard is soliciting proposals for unplanned drydock repairs for the USCGC BEAR (WMEC 901) during Fiscal Year 2026. This is a Total Small Business Set-Aside opportunity. The response deadline has been extended to April 10, 2026, at 2:00 PM EDT.

Scope of Work

The primary services required include:

  • Work Item 1: Tanks, Ballast, Repair and Preserve 100 Percent for specific ballast tanks (4-228-1-W, 4-228-2-W, 4-242-0-W). This involves extensive steel renewal (approx. 300 sq ft per tank), internal structure repair, and 100% surface preservation. These tanks are also used for grey water and are considered immediately dangerous to life and health (IDLH).
  • Work Item 2: Drydocking the vessel, including underwater body cleaning and specific blocking arrangements.
  • Work Item 3: Temporary Services, Provide - Cutter, such as parking, electrical power, hazardous material/waste disposal, heavy lift equipment, and various water supplies.

Contract & Timeline

  • Contract Type: Firm Fixed Price
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Period of Performance: Scheduled for FY2026 at a commercial contractor's facility. The exact Period of Performance (POP) is subject to further determination after tank inspections, with updates to be provided to vendors.
  • Response Due: April 10, 2026, at 2:00 PM EDT
  • Published: March 9, 2026
  • Place of Performance: Portsmouth, VA (shipyards within 50 miles of Portsmouth, VA will be considered).

Key Requirements & Clarifications

  • The solicitation has undergone several amendments, including the distribution of Revision 1 of the Statement of Work (SOW), dated February 19, 2026, which provides updated details on steel quantities, baffle fabrication, and other work items.
  • Clarifications have been provided regarding the Period of Performance, docking calculations (use "Full Load Conditions"), manhole cover retention, and potential interference with EDG and Steering Systems.
  • Ship checks for ballast tank availability are anticipated during the week of March 23-28, and are highly recommended for bidding purposes.
  • New clauses, including 3052.223-90 Accident and Fire Reporting and 3052.240-71 Contractor Employee Access, have been added.

Evaluation

Evaluation will be based on Technical Capability, Experience, Past Performance, and Price, with technical factors being significantly more important than price.

Additional Notes

Contractors must maintain an active Federal Government contracts registration in the System for Award Management (SAM). A 10% withholding of the total contract price will occur until all deliverables are received and accepted.

Primary Contact: Petal Donald at petal.c.donald@uscg.mil

People

Points of Contact

Petal DonaldPRIMARY
Alissa GavalianSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Solicitation
Posted: Mar 9, 2026
Version 4
Solicitation
Posted: Mar 3, 2026
View
Version 3
Solicitation
Posted: Feb 23, 2026
View
Version 2
Solicitation
Posted: Feb 18, 2026
View
Version 1
Solicitation
Posted: Jan 29, 2026