East St. Louis Design Deficiency BP12 Phase 2
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Sources Sought Notice to identify potential System for Award Management (SAM) Database registered businesses that are interested and capable of performing construction work on the MESD levee system which includes 34 t-type (subsurface discharge) relief wells, reinforced concrete manholes and associated lateral and common collector system piping, temporary designed braced steel shoring systems, dewatering of excavations, jack and bore trenchless pipe installation, construction ofaccess roads, close coordination with railroads, fill of low elevation areas, and creation of detention ponds. SEE ATTACHMENT FOR FULL DETAILS