EIE484 Permanent Party Dormitory

SOL #: W911KB27RA007Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SN ENDIST ALASKA
ANCHORAGE, AK, 99506-0898, United States

Place of Performance

Eielson AFB, AK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Troop Housing Facilities (Y1FC)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 27, 2026
2
Last Updated
Apr 28, 2026
3
Response Deadline
May 12, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE), Alaska District, is conducting market research through a Sources Sought Notice for the EIE484 Permanent Party Dormitory project at Eielson Air Force Base (AFB), Alaska. This project involves constructing a 3-story dormitory to house 225 unaccompanied enlisted airmen, with an estimated magnitude of $200,000,000 - $250,000,000. Responses are due by May 12, 2026, at 2:00 PM ADT via an online form.

Purpose & Scope

This notice is for market research only and is not a solicitation. Its purpose is to identify qualified and interested businesses, particularly within the Small Business Community (Small Business, Section 8(a), HUBZone, SDVOSB, WOSB), capable of performing the described construction. The acquisition strategy will be determined based on responses. The project includes constructing a complete and usable facility with slab-on-grade, steel frame, concrete masonry unit block veneer, and a standing seam metal roof. Supporting facilities include 200 parking spaces, utility extensions (steam, water, sewer, power), and landscaping.

Project Details

  • Location: Eielson Air Force Base (AFB), Alaska
  • NAICS: 236220 (Commercial and Institutional Building Construction)
  • PSC: Y1FC (Construction Of Troop Housing Facilities)
  • Estimated Magnitude: $200,000,000 - $250,000,000
  • Anticipated Solicitation Issuance: April 27, 2027
  • Estimated Duration: 952 calendar days
  • Anticipated Contract Type: Competitive, Firm-Fixed-Price
  • Acquisition Method: FAR Part 15, Negotiated Procurement using "Best Value" trade-off process.

Key Requirements & Capabilities

Respondents should demonstrate experience in:

  • Deep Dynamic Compaction
  • Cold Region area construction
  • Structures of similar size and height (Min. 100,000 SF, 2-5 stories)
  • Large utilidor (2-5 utilities) experience
  • Similar Acoustic installation experience (e.g., hotels, apartments, dorms)
  • CMMC Requirement: Level 1 Self Certification will be required.

Submission Information

  • Method: Responses must be submitted exclusively via the online Market Survey Form (link provided in the original notice).
  • Deadline: May 12, 2026, by 2:00 PM ADT.
  • Note: No reimbursement will be made for response costs. Not responding does not preclude future participation. Prospective subcontractors are encouraged to submit information for potential Small Business Participation Plans.

People

Points of Contact

Files

Files

View
Download

Versions

Version 2Viewing
Sources Sought
Posted: Apr 28, 2026
Version 1
Sources Sought
Posted: Apr 27, 2026
View