Electrical Feeder Upgrades, Black Rock Lake Dam, Thomaston, Connecticut

SOL #: W912WJ26X1BCUSources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SD ENDIST NEW ENGLAND
CONCORD, MA, 01742-2751, United States

Place of Performance

Thomaston, CT

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
Mar 6, 2026
2
Response Deadline
Apr 6, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers, New England District, is issuing a Sources Sought notice for Electrical Feeder Upgrades at Black Rock Lake Dam in Thomaston, Connecticut. This market research aims to identify qualified 8(a), HUBZone, Service-Disabled Veteran-Owned, Women-Owned, and Small Business concerns. The estimated construction cost is between $1,000,000 - $5,000,000. Responses are due by April 6, 2026.

Project Overview

This project involves significant electrical infrastructure upgrades at the Black Rock Lake Dam, a critical component of the Naugatuck River Basin's flood control network. The modernization effort is essential to ensure the continued operational reliability and safety of the dam's electrical systems.

Scope of Work

Key tasks for this project include:

  • Replacing the existing overhead dam feeder with a new buried conduit duct bank.
  • Removing and replacing the existing gate tower feeder.
  • Removing existing manual transfer switches.
  • Replacing existing 480V Panel-A, transformer, and 120/208 Panel-B in the gate tower.
  • Installing a new propane genset and associated propane tank in the project office parking lot, sized to power both the project office and gate tower during utility outages.
  • Installing a new automatic transfer switch to feed existing panel MDP-1 from either the utility or the new genset.

Contract Details & Timeline

  • Opportunity Type: Sources Sought (Market Research)
  • NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors)
  • Estimated Cost: $1,000,000 - $5,000,000
  • Planned Solicitation: Fall 2026
  • Construction Period: Fall/Winter 2026
  • Published Date: March 6, 2026

Submission Requirements

Interested firms must submit a capabilities package, limited to twenty pages, detailing:

  • Business classification (e.g., HUBZone, Small Business).
  • Qualifications and experience in performing the specified work components.
  • At least two specific project examples within the last seven years.
  • Identification of any subcontractors, their qualifications, and experience (within the last seven years).
  • Proof of bonding capability.

Response & Contact Information

Important Notes

This is a Sources Sought notice for informational purposes only and is not a Request for Proposal (RFP). The government will not pay for any material provided in response. Results of this survey will be considered for one year from the notice date.

People

Points of Contact

Files

Files

Download

Versions

Version 1Viewing
Sources Sought
Posted: Mar 6, 2026
Electrical Feeder Upgrades, Black Rock Lake Dam, Thomaston, Connecticut | GovScope