ELECTRICAL SWITCHING STATION NORTH, WATERVLIET ARSENAL, NEW YORK

SOL #: W912DS26RA015Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SD ENDIST NEW YORK
NEW YORK, NY, 10278-0004, United States

Place of Performance

Watervliet, NY

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Other Industrial Buildings (Y1EZ)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 11, 2026
2
Last Updated
Jun 12, 2026
3
Submission Deadline
Jun 19, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers, New York District (USACE NAN), is soliciting proposals for the construction of an Electrical Switching Station North at Watervliet Arsenal, New York. This project aims to provide 4000 kW of backup power to the existing south switch station. This is an unrestricted solicitation with a Hubzone preference, utilizing a Best Value Trade Off acquisition strategy. Proposals are due June 19, 2026, at 2:00 P.M. EST.

Scope of Work

The project entails the procurement and installation of four (4) 2MW generators, construction of a dedicated facility, and comprehensive electrical infrastructure. This includes electric manholes, duct banks, grounding, fencing, switchgear, transfer switches, cables, splices, connections, paving, walks, curbs, gutters, and utilities testing and commissioning. Additionally, the scope covers necessary utility interconnections for fuel supply and connecting the new station to the existing system. The project also requires space, racks, pathways, and cabling for CCTV and Intrusion Detection Systems (IDS), along with a complete card access control (CAC) system. Specific brand-name components are required for the fire alarm system (Simplex), electrical equipment (Schneider Square D), and IDS/CAC systems (HID, Honeywell, Trine, Assa Abloy).

Contract Details & Timeline

  • Contract Type: Firm Fixed Price (FFP) construction contract.
  • Magnitude: Estimated between $10,000,000 and $25,000,000.
  • NAICS Code: 236220 (Commercial & Institutional Building Construction).
  • Period of Performance: Approximately 1081 calendar days from the Notice to Proceed.
  • Proposal Due Date: June 19, 2026, 2:00 P.M. EST.
  • RFI Cutoff: June 2, 2026, 3:00 P.M. EST.
  • Set-Aside: Unrestricted, with Hubzone preference.

Evaluation Factors

Award will be based on a Best Value Trade Off, where technical factors combined are approximately equal in importance to price. Key evaluation factors include:

  • Factor 1: Past Performance (most important).
  • Factor 2: Proposed Contract Duration, Phasing, and Summary Schedule (equal to Factor 3).
  • Factor 3: Technical Approach (equal to Factor 2).
  • Factor 4: Small Business Participation Plan and Past Utilization of Small Business (less important).

Submission Requirements & Notes

Proposals must be submitted electronically via PDF. Offerors must submit a subcontracting plan and a bid guarantee (20% of bid price or $3M, whichever is less). Key clauses include FAR 52.236-7 (Permits and Responsibilities), FAR 252.204-7012 (Safeguarding Covered Defense Information and Cyber Incident Reporting), and FAR 52.222-90 (Addressing DEI Discrimination by Federal Contractors). Adherence to EM 385-1-1 safety standards, a Construction Waste Management Program, an Indoor Air Quality (IAQ) Construction Management Plan, and cybersecurity requirements for control systems are mandatory. Contractors must also complete the 3Rs Explosive Safety Education Program training.

People

Points of Contact

Orlando NievesPRIMARY
Matthew LubiakSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 13
Solicitation
Posted: Jun 12, 2026
View
Version 12
Solicitation
Posted: Jun 11, 2026
View
Version 11
Solicitation
Posted: Jun 8, 2026
View
Version 10Viewing
Solicitation
Posted: Jun 3, 2026
Version 9
Solicitation
Posted: Jun 1, 2026
View
Version 8
Solicitation
Posted: May 26, 2026
View
Version 7
Solicitation
Posted: May 22, 2026
View
Version 6
Solicitation
Posted: May 19, 2026
View
Version 5
Solicitation
Posted: May 18, 2026
View
Version 4
Solicitation
Posted: May 4, 2026
View
Version 3
Solicitation
Posted: Apr 29, 2026
View
Version 2
Solicitation
Posted: Apr 17, 2026
View
Version 1
Pre-Solicitation
Posted: Feb 11, 2026
View