Electrical system repair, Switchgear replacement. Supervisor's Office.

SOL #: 127EAW26Q0025Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 6
Albuquerque, NM, 871023498, United States

Place of Performance

CA

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Electric Wire, And Power And Distribution Equipment (J061)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 20, 2026
2
Submission Deadline
May 21, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotes for Electrical System Repair and Switchgear Replacement at the San Bernardino National Forest Supervisor's Office, California. This project involves replacing a damaged 5 kV, 2000-amp main switchgear with a new, modern arc-resistant system. This is a Total Small Business Set-Aside with an estimated magnitude between $500,000 and $1,000,000. Quotes are due May 21, 2026, at 11:00 AM Pacific Time.

Project Overview

The requirement is to remove the existing damaged 5 kV, 2000-amp main distribution switchgear, which suffered a catastrophic arc-flash event due to rodent intrusion. The contractor will install a new, modern, arc-resistant switchgear assembly incorporating advanced smart sensors and remote monitoring capabilities to enhance safety, reliability, and efficiency. The project also includes comprehensive power-system engineering studies (Short-Circuit, Protective Device Coordination, Arc Flash Hazard Analysis), site preparation, and updating electrical schematics.

Key Requirements & Deliverables

  • Demolition and removal of existing switchgear and associated components.
  • Installation of new 5KV 2000-amp Outdoor Metal-Clad Switchgear.
  • Repair of concrete slab, medium voltage cable installation, and bus duct installation.
  • Rigorous testing and commissioning of the new switchgear.
  • Provision of comprehensive power-system engineering studies, signed and sealed by a California Professional Electrical Engineer.
  • Coordination with Southern California Edison (SCE) and the local forest unit.
  • Compliance with NFPA 70 (NEC), OSHA, IEEE, NEMA standards, and the provided Fire Plan.
  • Adherence to Davis-Bacon Act prevailing wage rates for San Bernardino County, CA.

Contract Details

  • Type: Combined Synopsis/Solicitation (RFQ), anticipated Firm Fixed Price.
  • Set-Aside: Total Small Business Set-Aside.
  • NAICS Code: 238210 - Electrical Contractors and Other Wiring Installation Contractors (Size Standard: $19M).
  • Period of Performance: 180 calendar days from Notice to Proceed (NTP).
  • Estimated Start Date: June 1, 2026.

Submission & Evaluation

  • Site Visit: Strongly recommended on May 8, 2026, at 10:00 AM PT. See page 15 of the solicitation for details.
  • Requests for Information (RFIs) Deadline: May 12, 2026, at 11:00 AM PT. Submit using the provided RFI Form to Tanya.Torres@usda.gov.
  • Quote Submission Deadline: May 21, 2026, at 11:00 AM PT. Submit via email to Tanya.Torres@usda.gov.
  • Required Documents: Completed SF1442, Attachment 3 (Schedule of Items), Technical Approach/Past Performance documentation, and a Bid Guarantee for proposals exceeding $150,000.
  • Evaluation Criteria: Best Value, based on Technical Approach, Past Performance, and Price. No tradeoffs will be conducted.
  • Eligibility: Offerors must have an active entity registration at SAM.gov.

Important Notes

Contractors are responsible for all labor, materials, tools, permits, and equipment. Invoicing will be via the Invoice Processing Platform (IPP). The provided "Fire Plan for Construction and Service Contracts" outlines critical fire prevention and suppression responsibilities.

People

Points of Contact

Tanya TorresPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
Electrical system repair, Switchgear replacement. Supervisor's Office. | GovScope