ELECTRON TUBE
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This is a modification to a Department of the Navy solicitation for the repair of ELECTRON TUBE (NSN 5960-01-056-6001, CAGE 80070, Ref. No. 17-05660-1). The purpose of this amendment is to extend the response date to May 15, 2026, at 4:30 PM ET, and update clauses per a Revolutionary FAR Overhaul. The opportunity seeks qualified contractors to perform repairs with a Repair Turnaround Time (RTAT) of 413 days.
Scope of Work
The contractor will be responsible for repairing ELECTRON TUBEs to meet operational and functional requirements, adhering to the original manufacturer's specifications and drawings. All repair work must follow the contractor's standard practices, manuals, and directives. Government Source Inspection (GSI) is required. Items must be marked in accordance with MIL-STD-130, REV N. Specific procedures are outlined for changes in design, material, servicing, or part numbers.
Contract & Timeline
- Type: Request for Quote (RFQ) for repair, leading to a bilateral award.
- Response Due: May 15, 2026, at 4:30 PM ET.
- Published: May 7, 2026 (as a modification).
- Set-Aside: None specified.
- Product Service Code: 5960 (Electron Tubes And Associated Hardware).
Quote Requirements & Evaluation
Offerors must provide Unit Price, Total Price, and their proposed Repair Turnaround Time (RTAT). If the proposed RTAT exceeds 413 days, capacity constraints must be detailed. Quotes should also include information for a potential T&E fee if an asset is determined Beyond Repair (BR/BER), and new unit price/lead-time for comparison. A price reduction mechanism is in place for failure to meet the required RTAT, with the contractor proposing a per-unit/per-month reduction amount up to a maximum. Only authorized distributors of the original manufacturer's item will be considered for award, and proof of authorization is required with the offer.
Additional Notes
Freight is FOB Origin but handled by the Navy per the Commercial Asset Visibility (CAV) Statement of Work. Contractors must accurately report transactions in CAV. Detailed ordering information for various military and commercial documents (e.g., MIL-STD 2073 for packaging) and distribution statements for government documents are provided.