Elevator Controller Upgrades
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, specifically W6QM MICC-FT BELVOIR, has issued a Sources Sought notice for Elevator Controller Upgrades at Fort Meade, MD. This is a market research effort to identify potential vendors capable of providing non-commercial construction services to repair and upgrade controllers in one elevator. The anticipated contract duration is up to 12 months. Responses are due by April 23, 2026.
Scope of Work
The requirement involves the modernization of one passenger elevator in Building 4550 at Fort Meade, MD. This includes upgrading mechanical systems, controls, and safety features to meet contemporary codes and standards. Specific components to be replaced or upgraded include:
- New Elevator Submersible Pumping Unit
- New Controller
- New Elevator Signals/Fixtures
- New Hoistway Doors and Equipment
- New Car Door and Equipment
- New Elevator Wiring
- New Cab Interior
Performance standards require equipment to be American Made, Non-Proprietary, durable, and reliable, complying with ASME A17.1/CSA B44 standards and IBC 2021 code updates. The contractor must minimize elevator downtime, maintain clean and safe work areas, and provide a proposal based on an assessment and customized upgrade plan.
Key Information Requested
Interested parties are requested to provide:
- Firm details (name, POC, size, certifications, NAICS code).
- Interest in prime contracting or subcontracting/teaming.
- Detailed experience with similar requirements (size, scope, complexity, timeframe).
- Information on commercial availability and pricing.
- Recommendations for structuring contract requirements to facilitate competition, especially among small businesses.
- Suggestions for improving the approach/specifications/draft PWS/PRS.
- Confirmation of understanding and compliance with FAR 52.219-14 Limitation of Subcontracting.
- Identification of any factors that may be unnecessarily restricting competition.
Contract & Timeline
- Type: Sources Sought (Market Research)
- Duration: Anticipated up to 12 months
- Set-Aside: None specified (market research to determine potential small business participation)
- NAICS Code: 238290 (Other Building Equipment Contractors)
- Response Due: April 23, 2026, 2:00 PM ET
- Published: April 2, 2026
Additional Notes
This notice is for planning purposes only and does not constitute a solicitation or commitment by the government to award a contract. Responding to this notice does not preclude participation in any future solicitation.