Engine REM Install

SOL #: 52000PR260023600Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
SFLC PROCUREMENT BRANCH 3(00040)
BALTIMORE, MD, 21226, United States

Place of Performance

Fort Bragg, CA

NAICS

Ship Building and Repairing (336611)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Ship And Marine Equipment (J020)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 12, 2026
2
Submission Deadline
Mar 21, 2026, 12:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard, Surface Forces Logistics Center (SFLC) is soliciting quotes for Engine REM Install services for a 47 FT Motor Life Boat (MLB) 47271. This Total Small Business Set-Aside opportunity requires the haul out, port engine removal, and reinstallation of a repaired or new port engine at U.S. Coast Guard Station Noyo River, Fort Bragg, CA. Quotes are due by March 21, 2026.

Scope of Work

The contractor shall provide all labor, equipment, and facilities to:

  • Haul out USCG 47 FT MLB 47271 to stable blocking or cradle using two straps.
  • Securely block the vessel in accordance with military specifications.
  • Remove the port engine and reinstall a repaired or new port engine, following MPC's and Manufacturer's Instructions.
  • Launch the vessel using two straps.
  • Ensure the vessel is ready for use within 5 working days from scheduled haul out after contract award.
  • The Coast Guard representative will ensure watertight integrity and test all propulsion machinery before launch.

Key Requirements

  • Vessel Specifications: Hull Length 47’ 11”, Beam 14’ 0”, Hoisting condition 40,000 LBS.
  • Work Conditions: If additional work is found after haul out, the contractor must report findings immediately via CFR with a commercial estimate.
  • Workmanship: All work must be accomplished with best standard practices by experienced personnel, supervised by experienced personnel, and be satisfactory to the Contracting Officer Representative (COR).
  • Compliance: Contractor must obtain all necessary permits, licenses, and comply with all applicable federal, state, and local laws.
  • Cleanup: Responsible for removing all HAZWASTE, trash, and debris, leaving the job site clean.
  • Inspection: Upon completion, contact the COR for inspection and acceptance.
  • Modifications: No oral modifications to the contract are permitted.

Contract Details

  • Solicitation Number: 52000PR260003600 (RFQ)
  • Contract Type: Firm Fixed Price Purchase Order
  • Set-Aside: Total Small Business
  • Place of Performance: U.S. Coast Guard Station Noyo River, 19325 South Harbor Drive, Fort Bragg, CA 95437.
  • Period of Performance: Work to commence within 5 days of acceptance and be completed within 5 working days from scheduled haul out after contract award. Work hours are Monday through Friday, 7:00 AM to 1:00 PM, unless otherwise coordinated.
  • Invoicing: All invoicing will be processed through https://www.ipp.gov.

Evaluation Criteria

Quotes will be evaluated based on:

  1. Technical Capability: Offeror’s ability to perform services as described in the PWS.
  2. Past Performance: Offeror’s record of relevant and recent past performance.
  3. Price: Fair and reasonable pricing.

Submission & Points of Contact

People

Points of Contact

Joshua RichardsonPRIMARY

Files

Files

Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 12, 2026
Engine REM Install | GovScope