Entrance Bridge Concrete Abutment Repairs, Otter Brook Lake, Keene, NH

SOL #: W912WJ26QA080Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SD ENDIST NEW ENGLAND
CONCORD, MA, 01742-2751, United States

Place of Performance

Keene, NH

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 27, 2026
2
Last Updated
Apr 24, 2026
3
Submission Deadline
Apr 28, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers – New England District is soliciting proposals for Entrance Bridge Concrete Abutment Repairs at Otter Brook Lake in Keene, NH. This project involves comprehensive concrete repair, surface preparation, and sealing of the Route 9 Entrance Bridge abutments and wingwalls. This is a Total Small Business Set-Aside with an estimated value between $100,000 and $250,000. Proposals are due April 28, 2026, at 5:00 PM Eastern.

Scope of Work

The contractor will furnish all labor, materials, and equipment for the repair of concrete abutments and wingwalls at the Route 9 Entrance Bridge. Key tasks include:

  • Removal of approximately 525 sq ft of parge coat.
  • Performing 2-inch deep concrete repairs (approx. 52 sq ft) and 4-inch deep concrete repairs (approx. 133 sq ft).
  • Application of joint sealant, pressure washing, and coating with penetrating sealer (approx. 525 sq ft).
  • Erecting water retention structures and implementing temporary water control measures to ensure a dry work area and prevent material entry into Otter Brook.
  • Compliance with a Wetlands Permit issued by NHDES.
  • Developing and submitting an Accident Prevention Plan (APP), Site Safety and Health Plan (SSHP), Activity Hazard Analysis (AHA), and a Waste Management Plan (60% diversion goal).
  • The in-water work period is from July 6, 2026, through September 30, 2026.

Contract Details

  • Contract Type: Firm Fixed Price
  • Period of Performance: From Notice to Proceed through September 30, 2026.
  • Estimated Value: $100,000 to $250,000
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS: 237310 (Small Business Size Standard: $45 Million)
  • Place of Performance: Keene, NH

Submission & Evaluation

  • Proposal Due: April 28, 2026, 5:00 PM Eastern.
  • Submission: Quotes must be emailed to the Contract Specialist.
  • Mandatory Requirement: A Solicitation Survey must be completed and submitted with the quote. This survey assesses company information, experience, personnel, subcontracting plans, employee experience, and certifications/licenses.
    • Clarifications from Amendments: Crane operator/rigger certifications are only required if crane equipment is used. Past performance of sister companies will NOT be recognized.
  • Evaluation Factors: Technical, Price, and Past Performance.
  • Eligibility: All vendors must have an active SAM.gov registration at the time of submission.
  • Recommendation: Site visits are highly recommended to understand the scope and existing conditions.

Amendments

  • Amendment 0001 (April 20, 2026): Provided responses to industry questions and a revised Solicitation Survey.
  • Amendment 0002 (April 23, 2026): Provided responses to additional industry questions (Q#3-Q#21), clarifying various technical and procedural aspects of the project. Both amendments confirmed the unchanged solicitation closing date.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 5
Solicitation
Posted: Apr 24, 2026
View
Version 4Viewing
Solicitation
Posted: Apr 23, 2026
Version 3
Solicitation
Posted: Apr 20, 2026
View
Version 2
Solicitation
Posted: Apr 13, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 27, 2026
View