Erie Pier Confined Disposal Facility (CDF) Materials Management
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
*** Amendment 0002 is issued to Update the applicable Davis Bacon Wage Determination, Add FAR Clause 52.236-17, Revise FAR Clause 52.211-10, Revise Drawing C-101 and specification sections 01 35 13 and 31 00 00. See amendment document for further details. *** Amendment 0001 is issued to extend the suspense date from January 17, 2025 to February 28, 2025 and to revise FAR Clauses 52.211-10 and 52.211-10 ALT I. See amendment document for further details.*** Erie Pier Confined Disposal Facility (CDF) is an 82-acre disposal facility located near 40th Avenue East in Duluth-Superior Harbor. The facility is used as a stockpile site for dredge material taken from Duluth Superior Harbor and other sites. A total of 55,000 cubic yards of fine-grained dredged material, stockpiled within the CDF, shall be transported to specified destinations. The stockpiled material is a combination of dry and saturated material. The contractor will mobilize on site, excavate, dewater, and load the material into a transportation vehicle to be hauled to specified local upland sites for beneficial reuse. Construction work includes site work and preparation for loading activities, clearing and grubbing, earthwork, haul road maintenance, and other requirements incidental to the work requirements. Performance may be completed throughout the calendar year.