EWP 5087-001 Elkhorn Site & Northfork Church Site in McDowell County, West Virginia

SOL #: 12FPC326B0002Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Farm Production And Conservation Business Center
FPAC BUS CNTR-ACQ DIV
WASHINGTON, DC, 20250, United States

Place of Performance

WV

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 8, 2026
2
Last Updated
May 4, 2026
3
Submission Deadline
May 5, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Natural Resources Conservation Service (NRCS) is soliciting bids for Emergency Watershed Protection (EWP) construction services for erosion control at the Elkhorn Site and Northfork Church Site in McDowell County, West Virginia. This is a Firm Fixed Price contract, 100% set-aside for Total Small Businesses. The estimated value is between $200,000 and $250,000.

Scope of Work

The project involves comprehensive erosion control measures, including:

  • Laying wire mesh gabions.
  • Preparing foundations on shallow bedrock.
  • Rebar anchoring.
  • Riprap foundation protection.
  • Construction drawings, specifications, and wage rates are provided as attachments.
  • Compliance with OSHA standards and NRCS Supplement to OSHA Parts 1910 and 1926, including a comprehensive safety program, is required.

Contract Details

  • Contract Type: Firm Fixed Price commercial services contract (Combined Synopsis/Solicitation).
  • Estimated Value: Between $200,000 and $250,000.
  • Period of Performance: Construction completion is required by July 31, 2026.
  • NAICS Code: 237990 (OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION) with a $45.0 million average annual revenue size standard.
  • Place of Performance: McDowell County, West Virginia.

Submission & Evaluation

  • Bids must be submitted electronically via email to mark.domingo@usda.gov.
  • Award will be made to the responsible bidder whose bid is most advantageous to the Government, considering only price.
  • Bids may be rejected if materially unbalanced or unrealistically low.
  • A bid bond of 20% of the bid price is required.
  • A Payment Bond (SF-25A), Irrevocable Letter of Credit (ILC), or Tripartite Escrow Agreement for 100% of the project cost is required within 10 calendar days of award.

Key Dates & Site Visit

  • Site Visit: April 21, 2026, at 10:30 AM EST. Interested bidders will meet at a nearby church. Attendance is strongly urged.
  • Questions Due: April 28, 2026, by 12:00 PM CST.
  • Bids Due: May 5, 2026, by 12:00 p.m. CST.

Eligibility & Requirements

  • This acquisition is a 100% Total Small Business Set-Aside.
  • Contractors must be actively registered in the System for Award Management (SAM.gov).
  • Wage Determinations (WD 2015-4351 Rev. 30 and WV20250061) are attached and crucial for labor cost estimation.

Attachments & Important Notes

Key attachments include detailed Construction Specifications, Revised Drawings (dated 4-17-2026), and Construction Wage Determinations. These documents define the scope, technical requirements, material standards, and labor costs. The solicitation incorporates provisions by reference; full text is available upon request or at acquisition.gov.

People

Points of Contact

Mark DomingoPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
View
Version 6Viewing
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View