EWP 5087-001 Elkhorn Site & Northfork Church Site in McDowell County, West Virginia

SOL #: 12FPC326B0002Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Farm Production And Conservation Business Center
FPAC BUS CNTR-ACQ DIV
WASHINGTON, DC, 20250, United States

Place of Performance

WV

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 8, 2026
2
Last Updated
May 4, 2026
3
Submission Deadline
May 5, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Natural Resources Conservation Service (NRCS) is soliciting bids for erosion control construction services at the Elkhorn Site & Northfork Church Site in McDowell County, West Virginia. This Firm Fixed Price contract, valued between $200,000 and $250,000, is a 100% Total Small Business Set-Aside. Bids are due by May 5, 2025, at 12:00 p.m. CST.

Scope of Work

This project, under the Emergency Watershed Protection (EWP) program, requires comprehensive erosion control measures. Key tasks include:

  • Laying wire mesh gabions and grouted rock riprap.
  • Preparing foundations on shallow bedrock.
  • Rebar anchoring and riprap foundation protection.
  • Channel clearing and shaping, pollution control, excavation, earthfill, drainfill, rockfill, steel reinforcement, plastic pipe, and geotextile installation.
  • Compliance with detailed construction drawings, specifications, and prevailing wage rates (Davis Bacon).
  • Adherence to OSHA standards and NRCS safety supplements, requiring a comprehensive safety program.

Contract Details & Requirements

  • Contract Type: Firm Fixed Price Commercial Services Contract.
  • Estimated Value: $200,000 - $250,000.
  • Period of Performance: Construction completion by July 31, 2026. The entire work must be completed within 50 calendar days after the Notice to Proceed.
  • Set-Aside: 100% Total Small Business.
  • NAICS Code: 237990 (Other Heavy and Civil Engineering Construction) with a $45.0 million size standard.
  • Bonds: A 20% bid bond is required. A Payment Bond (SF-25A), Irrevocable Letter of Credit (ILC), or Tripartite Escrow Agreement for 100% of the project cost is required within 10 calendar days of award.
  • Specifics: Contractors must bid for rebar anchoring and foundation preparation as if needed, with final determination by the NRCS Engineer. Strict guidelines apply to dewatering, concrete testing, and grout placement to prevent stream contamination.

Submission & Evaluation

  • Bids Due: May 5, 2025, by 12:00 p.m. CST. Bids must be submitted electronically via email to mark.domingo@usda.gov.
  • Questions Due: April 28, 2026, by 12:00 p.m. CST.
  • Site Visit: A strongly urged site visit is scheduled for April 21, 2026, at 10:30 AM EST. Attendees will meet at a nearby church.
  • Eligibility: Interested contractors must be registered in the System for Award Management (SAM.gov).
  • Evaluation: Award will be made to the responsible bidder whose bid is most advantageous to the Government, considering only price. Bids that are materially unbalanced or unrealistically low may be rejected.

Contact Information

People

Points of Contact

Mark DomingoPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
Version 7Viewing
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
Version 6
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View