EWP 5087-001 Elkhorn Site & Northfork Church Site in McDowell County, West Virginia

SOL #: 12FPC326B0002Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Farm Production And Conservation Business Center
FPAC BUS CNTR-ACQ DIV
WASHINGTON, DC, 20250, United States

Place of Performance

WV

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 8, 2026
2
Last Updated
May 4, 2026
3
Submission Deadline
May 5, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Natural Resources Conservation Service (NRCS) is soliciting bids for erosion control construction services under the Emergency Watershed Protection (EWP) program in McDowell County, West Virginia. This is a 100% Total Small Business Set-Aside for a Firm Fixed-Price contract, estimated between $200,000 and $250,000. Bids are due by May 5, 2026, at 12:00 p.m. CST.

Scope of Work

This opportunity requires construction services at two sites: the Elkhorn Site and Northfork Church Site. The work involves implementing erosion control measures, including laying wire mesh gabions, preparing foundations on shallow bedrock, rebar anchoring, and riprap foundation protection. One site will utilize gabions, while the other will use grouted rock riprap. Compliance with OSHA standards and the NRCS Supplement to OSHA Parts 1910 and 1926, including a comprehensive safety program, is mandatory. Detailed construction drawings and specifications are provided in the attachments.

Contract Details

  • Contract Type: Firm Fixed-Price (FFP) commercial services contract.
  • Estimated Value: Between $200,000 and $250,000.
  • Period of Performance: Construction completion is required by July 31, 2026. The entire work must be completed within 50 calendar days after the Notice to Proceed. Maximum workweek is 10 hours per day, 6 days a week.
  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 237990 (OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION) with a $45.0 million average annual revenue size standard.

Submission & Evaluation

  • Bid Submission: Bids must be submitted electronically via email to mark.domingo@usda.gov by May 5, 2026, at 12:00 p.m. CST.
  • Evaluation Criteria: Award will be made to the responsible bidder whose bid is most advantageous to the Government, considering only price. Bids may be rejected if materially unbalanced or unrealistically low.
  • Mandatory Requirements:
    • Contractors must be registered in the System for Award Management (SAM.gov).
    • A bid bond of 20% of the bid price is required.
    • A Payment Bond (SF-25A), Irrevocable Letter of Credit (ILC), or Tripartite Escrow Agreement for 100% of the project cost is required within 10 calendar days of award.
    • Prevailing Davis Bacon wages apply.

Key Dates & Contacts

  • Site Visit: A site visit is strongly urged and scheduled for April 21, 2026, at 10:30 AM EST. Attendees should meet at a nearby church.
  • Questions Due: All questions must be submitted via email by April 28, 2026, at 12:00 p.m. CST.
  • Contact: Mark Domingo (mark.domingo@usda.gov).

Important Notes & Clarifications

Responses to vendor questions clarify several aspects: excess material must be hauled off-site to an approved landfill (contractor responsible for fees); specific bid items for foundation preparation and riprap protection must be bid as if needed; dewatering of foundations is required without blocking the stream; contractors are responsible for concrete testing; and strict guidelines apply to grout placement and gabion stone facing. Detailed drawings (Attachment 2), specifications (Attachment 1), and wage determinations (Attachment 3) are critical for bid preparation.

People

Points of Contact

Mark DomingoPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9Viewing
Combined Synopsis/Solicitation
Posted: May 4, 2026
Version 8
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View