Extending the Scrubber Stack at the Watervliet Arsenal, Watervliet, NY
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army / ACC WVA has awarded DMyles Inc. (723U0) of Niagara Falls, NY, a Firm Fixed-Price contract for Extending the Scrubber Stack at the Watervliet Arsenal, Watervliet, NY. This is a direct 8(a) Sole Source acquisition, valued at $235,431.74, to enhance air quality at Building 35.
Scope of Work
The awarded contract, under Product Service Code Z2EC (Repair Or Alteration Of Production Buildings), involves the extension of an existing 48-inch diameter fiberglass reinforced plastic (FRP) air scrubber stack by an additional 10 feet. Key requirements include:
- Work performed in accordance with the Statement of Work under Project #26OD001.
- Use of new construction materials meeting specific standards (e.g., ASTM, AISC, NFPA).
- Installation of structural steel, ductwork, roofing, lightning protection, and electrical systems.
- Adherence to specific safety requirements, including OSHA compliance, PPE, and hazardous material handling.
- Required submittals include Safety Data Sheets, Asbestos Notification, Lockout/Tagout, Project Schedule, Contractor Safety Plan, Shop Drawings, Test/Inspection Reports, Paint Data, Welding Procedures, and Certifications.
Contract & Timeline
- Contract Type: Firm Fixed Price
- Value: USD 235,431.74
- Period of Performance: 60 days after notice to proceed
- Set-Aside: 8(a) Sole Source (FAR 19.8)
- Award Date: March 19, 2026
- Bonds: 100% Payment and Performance Bonds are required.
Evaluation & Requirements
Prior to award, bidders were required to carefully review delivery requirements and ensure schedule compliance. On-time delivery and product quality were critical considerations, with past performance being a major factor for future awards. A site visit was required to examine all conditions before proposal submission.
Additional Notes
The "Watervliet Arsenal Information for Contractors" (WAIC) document is incorporated by reference. The Technical Point of Contact is Sean Lyons, Contracting Officer is Joseph Pokrentowski, and Contract Specialist/Buyer is Christopher Battiste.