F-15 PUMP,SUBMERGED,AIRC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Aviation at Oklahoma City, OK has issued a Request for Quotation (RFQ) for the new manufacture of F-15 Submerged Aircraft Fuel Pumps. This opportunity seeks to procure fuel transfer pumps (NSN: 2915-00-537-0336 RK, Part Number: 380200-14) made of Aluminum Alloy, which are critical for transferring fuel within F-15 aircraft. Quotations are due by March 12, 2026.
Scope of Work
This solicitation is for the supply of PUMP, SUBMERGED, AIRC units. Key requirements include:
- Item: Fuel transfer pump for F-15 aircraft.
- Material: Aluminum Alloy.
- Quality Assurance: Compliance with ISO 9001-2015 standards.
- Inspection & Acceptance: At origin.
- IUID: Item Unique Identification (IUID) marking is required in accordance with MIL-STD-130 and DFARS 252.211-7003.
Contract Details
- Contract Type: Firm Fixed Price.
- Set-Aside: This is NOT a Small Business Set-Aside.
- Delivery: Required by April 26, 2026.
- Foreign Military Sales (FMS): This requirement is applicable for FMS.
Packaging & Transportation
Bidders must adhere to stringent packaging and transportation requirements:
- Packaging: In accordance with MIL-STD-2073 (Preservation Method 41, Cleaning/Drying) and MIL-STD-129 for marking. This includes specific markings for items with residual fuel, classifying them as hazardous material (UN3363, Class 9), requiring leak-proof liners, absorbent materials, and strong outer containers, certified by hazardous material personnel.
- Wood Packaging Material (WPM): Must comply with UN-implemented restrictions, requiring heat treatment (56°C/133°F for 30 minutes) and certification/marking.
- Transportation: F.O.B. terms are recommended as Origin or Destination. Bidders must contact DCMA Transportation for shipping instructions via the SIR eTool System to avoid vendor expenditures.
Submission & Evaluation
- RFQ Number: SPRTA1-26-Q-0197.
- Quotation Due Date: March 12, 2026, Close of Business.
- Submission: Quotations must be submitted to the issuing office in Block 5A.
- Price Firmness: Offered prices must remain firm for 120 days.
- Evaluation: Further details on evaluation criteria are referenced as "SEE SCHEDULE" in the RFQ.
Contact Information
For inquiries, contact Lori Lumsden at lori.lumsden.1@us.af.mil.