F-15SA Programmed Depot Maintenance (PDM)

SOL #: FA8575_F15SA_PDMSources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8575 AFLCMC WAQKA
ROBINS AFB, GA, 31098-1670, United States

Place of Performance

Place of performance not available

NAICS

Aircraft Manufacturing (336411)

PSC

Modification Of Equipment: Aircraft And Airframe Structural Components (K015)

Set Aside

No set aside specified

Timeline

1
Posted
Jun 15, 2026
2
Response Deadline
Jun 30, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is issuing a follow-up Sources Sought Notice for F-15SA Programmed Depot Maintenance (PDM) for the Royal Saudi Air Force (RSAF). This is market research to gather industry feedback on updated program requirements, building on previous industry input. It is not a Request for Proposal (RFP) and does not guarantee a future contract.

Program Details & Scope

The PDM program aims to cover a total of 145 F-15SA aircraft (82 Production and 63 Converted), contingent on RSAF funding and USG options. The initial phase involves Validation and Verification (VAL/VER) for the first four jets. The scope includes extensive maintenance, modification, inspection, functional testing, and delivery tasks for F-15SA aircraft, ensuring operational readiness and service longevity. Work involves disassembly, structural and systems work, compliance with Technical Orders (TOs), and final processing.

Key Requirements & Performance

Work must adhere to applicable Technical Orders (TOs), Country Specific Technical Orders (CSTOs), and Country Specific Time Compliance Technical Orders (CSTCTOs). Performance standards include strict quality control, timely delivery (maximum 230 days per aircraft flow), and high acceptance rates for flight quality and safety inspections. The primary Place of Performance is expected to be the Contractor’s Installation Facility in Saudi Arabia, with potential for services at RSAF operating bases.

Industry Questions & Special Considerations

The USG requests industry feedback on the Performance Work Statement (PWS), Work Specification (WS), and the Government Furnished Equipment (GFE) list. Bidders should provide a Rough Order of Magnitude (ROM) price estimate, suggest how to address Intellectual Property (IP), and identify necessary job positions and skill levels.

A critical aspect for bidders is Saudi Arabia's Industrial Participation Policy (IPP), which requires a minimum 60% Industrial Participation Commitment for supply contracts valued at SAR 150 million or more, aligning with Saudi Vision 2030 localization goals. Contractors will be responsible for Government Property, Customs' Duties/Taxes (including Saudi VAT), 100% Quality Management System (QMS) compliance, and stringent security and safety requirements.

Contract & Timeline

  • Type: Sources Sought (Market Research)
  • Set-Aside: None specified
  • Response Due: June 30, 2026
  • Published: June 15, 2026

Contact Information

People

Points of Contact

Chantel CummingsPRIMARY
Leon CastellanoSECONDARY

Files

Files

Download
Download
Download

Versions

Version 1Viewing
Sources Sought
Posted: Jun 15, 2026
F-15SA Programmed Depot Maintenance (PDM) | GovScope